Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
124
matching recommendationsNAICS | 327993 | Mineral Wool Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0594 # 03 Y:2020 | 03 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $54,583 | $3,500 | Implemented |
WV0594 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,704 | $1,950 | Implemented |
WV0594 # 02 Y:2020 | 02 | 2020 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $94,912 | $539,790 | Not Implemented |
WV0594 # 11 Y:2020 | 11 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $703 | $896 | Implemented |
WV0594 # 04 Y:2020 | 04 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $46,633 | $20,450 | Implemented |
WV0594 # 09 Y:2020 | 09 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,851 | $1,500 | Implemented |
WV0594 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,869 | $90 | Implemented |
WV0594 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $18,093 | $41,800 | Implemented |
WV0594 # 10 Y:2020 | 10 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,131 | $0 | Not Implemented |
WV0594 # 01 Y:2020 | 01 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $126,819 | $150,000 | Not Implemented |
WV0594 # 06 Y:2020 | 06 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $17,638 | $2,295 | Implemented |
WV0554 # 04 Y:2018 | 04 | 2018 | INSULATE BARE EQUIPMENT | $16,102 | $29,747 | Not Implemented |
WV0554 # 11 Y:2018 | 11 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $424 | $133 | Implemented |
WV0554 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,149 | $77,350 | Not Implemented |
WV0554 # 02 Y:2018 | 02 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $17,639 | $30,000 | Implemented |
WV0554 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,081 | $5,593 | Implemented |
WV0554 # 06 Y:2018 | 06 | 2018 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $6,147 | $21,264 | Implemented |
WV0554 # 05 Y:2018 | 05 | 2018 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,868 | $1,000 | Implemented |
WV0554 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,731 | $32,581 | Not Implemented |
WV0554 # 09 Y:2018 | 09 | 2018 | MINIMIZE WATER USAGE | $1,354 | $700 | Implemented |
WV0554 # 08 Y:2018 | 08 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,406 | $632 | Implemented |
WV0554 # 10 Y:2018 | 10 | 2018 | INSTALL SET-BACK TIMERS | $974 | $2,132 | Not Implemented |
WV0554 # 12 Y:2018 | 12 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $221 | $516 | Implemented |
UM0459 # 03 Y:2015 | 03 | 2015 | ADJUST BURNERS FOR EFFICIENT OPERATION | $299,710 | $30,000 | Implemented |
UM0459 # 01 Y:2015 | 01 | 2015 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $115,156 | $525,000 | Not Implemented |