IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 327993 Mineral Wool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0332 # 02 Y:2025 02 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $1,541 $120 n/a
TT0332 # 03 Y:2025 03 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,989 $960 n/a
TT0332 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,645 $1,825 n/a
TT0332 # 05 Y:2025 05 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,283 $1,000 n/a
TT0332 # 06 Y:2025 06 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $206 $200 n/a
TT0332 # 07 Y:2025 07 2025 RECOVER WASTE HEAT FROM EQUIPMENT $867 $3,000 n/a
TT0332 # 08 Y:2025 08 2025 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $3,379 $15,000 n/a
TT0332 # 09 Y:2025 09 2025 UPGRADE CONTROLS ON COMPRESSORS $1,012 $5,000 n/a
TT0332 # 01 Y:2025 01 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $726 $30 n/a
UA0288 # 05 Y:2024 05 2024 RECOVER WASTE HEAT FROM EQUIPMENT $16,178 $10,450 n/a
UA0288 # 09 Y:2024 09 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,856 $4,621 n/a
UA0288 # 08 Y:2024 08 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,656 $994 n/a
UA0288 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $290,423 $2,558,734 n/a
UA0288 # 06 Y:2024 06 2024 OPTIMIZE PLANT POWER FACTOR $8,607 $5,049 n/a
UA0288 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,987 $8,591 n/a
UA0288 # 03 Y:2024 03 2024 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,549 $1,031 n/a
UA0288 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,645 $1,000 n/a
UA0288 # 01 Y:2024 01 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,634 $1,046 n/a
WV0594 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $18,093 $41,800 Implemented
WV0594 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $46,633 $20,450 Implemented
WV0594 # 03 Y:2020 03 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $54,583 $3,500 Implemented
WV0594 # 02 Y:2020 02 2020 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $94,912 $539,790 Not Implemented
WV0594 # 11 Y:2020 11 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $703 $896 Implemented
WV0594 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,869 $90 Implemented
WV0594 # 06 Y:2020 06 2020 DEVELOP A REPAIR/REPLACE POLICY $17,638 $2,295 Implemented