IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0565 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $583,260 $500 n/a
AS0565 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $139,376 $1,265,613 n/a
AS0565 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $89,587 $918,750 n/a
AS0565 # 04 Y:2023 04 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,687 $3,351 n/a
AS0565 # 05 Y:2023 05 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $1,336 $75 n/a
AS0565 # 06 Y:2023 06 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $617 $312 n/a
AS0565 # 07 Y:2023 07 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $454 $720 n/a
AS0458 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $229,273 $13,000 Implemented
AS0458 # 02 Y:2018 02 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $141,718 $198,093 Not Implemented
AS0458 # 03 Y:2018 03 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $108,000 $34,970 Not Implemented
AS0458 # 06 Y:2018 06 2018 RECOVER AND REUSE COOLING WATER $3,500 $2,576 Not Implemented
AS0458 # 08 Y:2018 08 2018 AIR CONDITION ONLY SPACE NECESSARY $713 $312 Not Implemented
AS0458 # 07 Y:2018 07 2018 COVER OPEN TANKS $1,285 $0 Not Implemented
AS0458 # 04 Y:2018 04 2018 USE SOLAR HEAT FOR HEAT $15,016 $6,034 Not Implemented
AS0458 # 05 Y:2018 05 2018 INSTALL SKYLIGHTS $14,020 $33,868 Not Implemented
AS0457 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,791 $19,647 Not Implemented
AS0457 # 06 Y:2018 06 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,736 $7,600 Not Implemented
AS0457 # 02 Y:2018 02 2018 USE SOLAR HEAT FOR HEAT $7,441 $1,961 Not Implemented
AS0457 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,832 $676 Implemented
AS0457 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,412 $2,750 Not Implemented
AS0457 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,174 $0 Implemented
AS0457 # 04 Y:2018 04 2018 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $4,539 $2,530 Not Implemented
SD0397 # 09 Y:2007 09 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,243 $3,825 Not Implemented
SD0397 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $51,686 $51,240 Not Implemented
SD0397 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,328 $44,175 Not Implemented