IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1037 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,395 $2,804 Implemented
OK1037 # 06 Y:2021 06 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $875 $298 Not Implemented
OK1037 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,825 $0 Not Implemented
OK1037 # 05 Y:2021 05 2021 INSTALL TIMERS AND/OR THERMOSTATS $206 $120 Implemented
OK1037 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $587 $955 Not Implemented
OK1037 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,155 $4,128 Implemented
OK1033 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,433 $2,100 Implemented
OK1033 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $343 $0 Not Implemented
OK1033 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $262 $700 Implemented
OK1033 # 05 Y:2020 05 2020 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,056 $671 Not Implemented
OK1033 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,570 $27,786 Implemented
OK0968 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,490 $0 Implemented
OK0968 # 07 Y:2017 07 2017 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $157,581 $3,000 Not Implemented
OK0968 # 06 Y:2017 06 2017 USE SHAFT TYPE FURNACES FOR PREHEATING INCOMING MATERIAL $670,334 $2,422,500 Not Implemented
OK0968 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,670 $90,081 Implemented
OK0968 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,717 $159,110 Implemented
OK0968 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,554 $1,388 Implemented
OK0968 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,259 $3,000 Implemented
OK0961 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $831 $3,220 Not Implemented
OK0961 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80,050 $185,484 Not Implemented
OK0961 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,978 $7,268 Not Implemented
OK0961 # 03 Y:2017 03 2017 INSTALL SET-BACK TIMERS $605 $800 Not Implemented
OK0961 # 11 Y:2017 11 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $44,544 $8,817 Not Implemented
OK0961 # 13 Y:2017 13 2017 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $311,801 $1,832,665 Not Implemented
OK0961 # 12 Y:2017 12 2017 REUSE RICH WHITE WATER IN OTHER APPLICATIONS $523,580 $500,000 Not Implemented