IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0322 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $415 $1,570 n/a
TT0322 # 02 Y:2025 02 2025 OPTIMIZE PLANT POWER FACTOR $16,071 $15,000 n/a
TT0322 # 05 Y:2025 05 2025 USE SOLAR HEAT FOR HEAT $40,764 $113,963 n/a
TT0322 # 04 Y:2025 04 2025 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $7,760 $15,000 n/a
TT0322 # 01 Y:2025 01 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $473 $60 n/a
TT0322 # 03 Y:2025 03 2025 INSTALL OCCUPANCY SENSORS $583 $875 n/a
TT0271 # 07 Y:2022 07 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,050 $640 Not Implemented
TT0271 # 10 Y:2022 10 2022 UPGRADE CONTROLS ON COMPRESSORS $237 $600 Implemented
TT0271 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,041 $1,262 Not Implemented
TT0271 # 02 Y:2022 02 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,358 $15,000 Not Implemented
TT0271 # 04 Y:2022 04 2022 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $2,610 $12,000 Not Implemented
TT0271 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,410 $3,000 Implemented
TT0271 # 09 Y:2022 09 2022 INSTALL TIMERS AND/OR THERMOSTATS $435 $200 Implemented
TT0271 # 06 Y:2022 06 2022 ADJUST BURNERS FOR EFFICIENT OPERATION $1,316 $1,500 Implemented
TT0271 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,479 $1,500 Implemented
TT0271 # 03 Y:2022 03 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,012 $0 Implemented
TT0242 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,251 $263 Not Implemented
TT0242 # 06 Y:2020 06 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,854 $1,700 Not Implemented
TT0242 # 01 Y:2020 01 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,906,442 $4,500,000 Implemented
TT0242 # 04 Y:2020 04 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $13,945 $1,900 Not Implemented
TT0242 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,412 $62,026 Not Implemented
TT0242 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,394 $110,050 Not Implemented
TT0226 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $31,634 $2,200 Not Implemented
TT0226 # 01 Y:2019 01 2019 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $1,033,923 $50,000 Not Implemented
TT0226 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,163 $30,000 Not Implemented