IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0436 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,983 $8,375 Not Implemented
WV0436 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,039 $1,920 Not Implemented
WV0436 # 07 Y:2011 07 2011 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $7,082 $25,000 Not Implemented
WV0436 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,227 $12,576 Implemented
WV0436 # 09 Y:2011 09 2011 INSTALL TIMERS AND/OR THERMOSTATS $4,976 $5,400 Not Implemented
WV0436 # 10 Y:2011 10 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,400 $1,000 Implemented
WV0436 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $335 $154 Implemented
MA0676 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,721 $2,750 Implemented
MA0676 # 05 Y:2011 05 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $593 $1,250 Implemented
MA0676 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,019 $500 Not Implemented
MA0676 # 02 Y:2011 02 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $24,027 $4,000 Not Implemented
MA0676 # 01 Y:2011 01 2011 OPTIMIZE PLANT POWER FACTOR $204,367 $98,845 Implemented
UA0064 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,684 $5,000 Implemented
UA0064 # 02 Y:2011 02 2011 INSTALL COMMON HEADER ON COMPRESSORS $52,970 $54,000 Not Implemented
UA0064 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,660 $800 Implemented
UA0064 # 04 Y:2011 04 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $52,129 $12,420 Not Implemented
OK0813 # 11 Y:2011 11 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,447 $25,472 Implemented
OK0813 # 01 Y:2011 01 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $116,318 $187,782 Not Implemented
OK0813 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,531 $65,527 Implemented
OK0813 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,048 $6,145 Not Implemented
OK0813 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,656 $11,978 Not Implemented
OK0813 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,231 $64,515 Implemented
OK0813 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $19,954 $13,110 Implemented
OK0813 # 10 Y:2011 10 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $19,937 $8,250 Not Implemented
OK0813 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,469 $7,737 Implemented