Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsNAICS | 33111 | Iron and Steel Mills and Ferroalloy Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0146 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $730 | $100 | Implemented |
DL0146 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $500 | $1,425 | Not Implemented |
DL0146 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,520 | $125,000 | Not Implemented |
DL0146 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,880 | $1,000 | Implemented |
LE0331 # 09 Y:2012 | 09 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $805 | $125 | Not Implemented |
LE0331 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,005 | $1,000 | Implemented |
LE0331 # 07 Y:2012 | 07 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,134 | $2,500 | Implemented |
LE0331 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,156 | $12,800 | Not Implemented |
LE0331 # 05 Y:2012 | 05 | 2012 | REDESIGN PROCESS | $20,100 | $0 | Implemented |
LE0331 # 04 Y:2012 | 04 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $24,579 | $0 | Implemented |
LE0331 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,201 | $136,500 | Not Implemented |
LE0331 # 02 Y:2012 | 02 | 2012 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $42,903 | $73,485 | Not Implemented |
LE0331 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $59,232 | $1,300 | Not Implemented |
WV0347 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $255,013 | $57,159 | Implemented |
WV0347 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $32,512 | $24,300 | Not Implemented |
WV0347 # 03 Y:2006 | 03 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $11,796 | $1,000 | Implemented |
WV0347 # 04 Y:2006 | 04 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $10,908 | $504 | Implemented |
WV0347 # 05 Y:2006 | 05 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $10,012 | $13,815 | Not Implemented |
WV0347 # 06 Y:2006 | 06 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,834 | $250 | Not Implemented |
WV0347 # 07 Y:2006 | 07 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,696 | $10,600 | Not Implemented |
WV0347 # 08 Y:2006 | 08 | 2006 | USE RADIANT HEATER FOR SPOT HEATING | $5,557 | $2,790 | Implemented |
WV0347 # 09 Y:2006 | 09 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,051 | $65 | Implemented |
WV0347 # 10 Y:2006 | 10 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $915 | $245 | Not Implemented |
WV0347 # 11 Y:2006 | 11 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $457 | $158 | Not Implemented |