24
matching recommendationsNAICS | 33111 | Iron and Steel Mills and Ferroalloy Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0146 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $730 | $100 | Implemented |
DL0146 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $500 | $1,425 | Not Implemented |
DL0146 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,520 | $125,000 | Not Implemented |
DL0146 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,880 | $1,000 | Implemented |
LE0331 # 09 Y:2012 | 09 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $805 | $125 | Not Implemented |
LE0331 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,005 | $1,000 | Implemented |
LE0331 # 07 Y:2012 | 07 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,134 | $2,500 | Implemented |
LE0331 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,156 | $12,800 | Not Implemented |
LE0331 # 05 Y:2012 | 05 | 2012 | REDESIGN PROCESS | $20,100 | $0 | Implemented |
LE0331 # 04 Y:2012 | 04 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $24,579 | $0 | Implemented |
LE0331 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,201 | $136,500 | Not Implemented |
LE0331 # 02 Y:2012 | 02 | 2012 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $42,903 | $73,485 | Not Implemented |
LE0331 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $59,232 | $1,300 | Not Implemented |
WV0347 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $255,013 | $57,159 | Implemented |
WV0347 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $32,512 | $24,300 | Not Implemented |
WV0347 # 03 Y:2006 | 03 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $11,796 | $1,000 | Implemented |
WV0347 # 04 Y:2006 | 04 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $10,908 | $504 | Implemented |
WV0347 # 05 Y:2006 | 05 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $10,012 | $13,815 | Not Implemented |
WV0347 # 06 Y:2006 | 06 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,834 | $250 | Not Implemented |
WV0347 # 07 Y:2006 | 07 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,696 | $10,600 | Not Implemented |
WV0347 # 08 Y:2006 | 08 | 2006 | USE RADIANT HEATER FOR SPOT HEATING | $5,557 | $2,790 | Implemented |
WV0347 # 09 Y:2006 | 09 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,051 | $65 | Implemented |
WV0347 # 10 Y:2006 | 10 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $915 | $245 | Not Implemented |
WV0347 # 11 Y:2006 | 11 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $457 | $158 | Not Implemented |