Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2012 |
Principal Product | Steel Bridges |
NAICS | 331110 - Iron and Steel Mills and Ferroalloy Manufacturing |
SIC | 3312 - Blast Furnaces And Steel Mills |
Sales | $100,000,000-$500,000,000 |
# of Employees | 20 |
Plant Area (Sq.Ft.) | 195,000 |
Annual Production | 13,000 Tons |
Production Hrs. Annual | 6,240 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $508,676 | 4,924,750 | kWh | $0.10 |
Electricity Demand | $62,681 | 13,717 | kW-months/year | $4.57 |
Natural Gas | $290,722 | 38,776 | MMBtu | $7.50 |
TOTAL ENERGY COSTS | $862,079 | |||
RECOMMENDED SAVINGS* | $193,115 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $50,818 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $59,232 Cost: $1,300 |
$54,881 | 548,812 | $4,351 | 952 | - | - | - | - |
$54,881 548,812 kWh |
$4,351 952 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $42,903 Cost: $73,485 |
- | - | - | - | $42,903 | 5,720 | - | - |
- - kWh |
- - kW-months/year |
$42,903 5,720 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $36,201 Cost: $136,500 |
$32,448 | 324,480 | $2,852 | 624 | - | - | $901 | - |
$32,448 324,480 kWh |
$2,852 624 kW-months/year |
- - MMBtu |
$901 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $24,579 Cost: - |
- | - | - | - | $24,579 | 3,278 | - | - |
- - kWh |
- - kW-months/year |
$24,579 3,278 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.5194 REDESIGN PROCESS |
Savings: $20,100 Cost: - |
$20,100 | 201,000 | - | - | - | - | - | - |
$20,100 201,000 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,156 Cost: $12,800 |
$2,634 | 26,338 | $558 | 122 | - | - | $(-36) | - |
$2,634 26,338 kWh |
$558 122 kW-months/year |
- - MMBtu |
$(-36) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $3,134 Cost: $2,500 |
- | - | $3,134 | 686 | - | - | - | - |
- - kWh |
$3,134 686 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,005 Cost: $1,000 |
$2,763 | 27,627 | $242 | 53 | - | - | - | - |
$2,763 27,627 kWh |
$242 53 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $805 Cost: $125 |
$526 | 5,262 | $279 | 61 | - | - | - | - |
$526 5,262 kWh |
$279 61 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $193,115 Cost: $227,710 |
$113,352 | 1,133,519 | $11,416 | 2,497 | $67,482 | 8,998 | $865 | - | $113,352 1,133,519 kWh |
$11,416 2,497 kW-months/year |
$67,482 8,998 MMBtu |
$865 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $50,818 Cost: $3,500 |
$22,863 | 228,627 | $3,376 | 739 | $24,579 | 3,278 | - | - | $22,863 228,627 kWh |
$3,376 739 kW-months/year |
$24,579 3,278 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |