Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
999
matching recommendationsNAICS | 3312 | Steel Product Manufacturing from Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0390 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $398 | $75 | Not Implemented |
LE0390 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $558 | $120 | Not Implemented |
LE0390 # 06 Y:2015 | 06 | 2015 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $47,479 | $25,500 | Implemented |
LE0390 # 07 Y:2015 | 07 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,361 | $2,457 | Not Implemented |
LE0390 # 08 Y:2015 | 08 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,333 | $5,028 | Not Implemented |
LE0390 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $3,974 | $7,332 | Not Implemented |
LE0390 # 10 Y:2015 | 10 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,602 | $5,200 | Not Implemented |
TT0142 # 01 Y:2014 | 01 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,305 | $1,400 | Implemented |
TT0142 # 02 Y:2014 | 02 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $299 | $596 | Not Implemented |
TT0142 # 03 Y:2014 | 03 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $861 | $1,662 | Not Implemented |
TT0142 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,651 | $3,000 | Implemented |
TT0142 # 05 Y:2014 | 05 | 2014 | DISCONNECT BALLASTS | $555 | $60 | Not Implemented |
TT0142 # 06 Y:2014 | 06 | 2014 | USE PHOTOCELL CONTROLS | $49 | $45 | Implemented |
NC0523 # 01 Y:2014 | 01 | 2014 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $156,000 | $600,000 | Not Implemented |
NC0523 # 02 Y:2014 | 02 | 2014 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $78,330 | $120,000 | Not Implemented |
NC0523 # 03 Y:2014 | 03 | 2014 | REPLACE BOILER | $58,620 | $90,000 | Not Implemented |
NC0523 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,419 | $146,762 | Not Implemented |
NC0523 # 05 Y:2014 | 05 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $8,560 | $2,500 | Not Implemented |
NC0523 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $3,012 | Implemented |
NC0523 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $176 | $200 | Implemented |
NC0523 # 08 Y:2014 | 08 | 2014 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $11,195 | $20,000 | Not Implemented |
NC0523 # 09 Y:2014 | 09 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,387 | $20,000 | Not Implemented |
NC0523 # 10 Y:2014 | 10 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,411 | $12,000 | Not Implemented |
NC0523 # 11 Y:2014 | 11 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,120 | $1,000 | Implemented |
NC0523 # 12 Y:2014 | 12 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,179 | $50 | Implemented |