IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

999

matching recommendations
Reset
NAICS 3312 Steel Product Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0418 # 15 Y:2012 15 2012 MOVE PRODUCT USING MECHANICAL MEANS $12,870 $20,000 Implemented
MZ0104 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,398 $26,000 Implemented
MZ0104 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $2,309 $1,750 Not Implemented
MZ0104 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,102 $0 Not Implemented
MZ0104 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,616 $30,000 Implemented
MZ0104 # 05 Y:2012 05 2012 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,111 $900 Implemented
MZ0104 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,299 $1,160 Not Implemented
MZ0104 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,461 $850 Not Implemented
MZ0104 # 08 Y:2012 08 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $152,137 $150,000 Not Implemented
MZ0104 # 09 Y:2012 09 2012 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $13,645 $25,000 Not Implemented
MZ0104 # 10 Y:2012 10 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $83,490 $112,500 Implemented
IA0489 # 01 Y:2012 01 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,668 $385 Not Implemented
IA0489 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $336 $298 Implemented
IA0489 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,582 $12,659 Implemented
IA0489 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,978 $13,325 Implemented
IA0489 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,029 $532 Implemented
IA0489 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,423 $1,091 Implemented
IA0489 # 07 Y:2012 07 2012 OPTIMIZE PLANT POWER FACTOR $8,468 $3,237 Not Implemented
IA0489 # 08 Y:2012 08 2012 REDUCE VENTILATION AIR $5,734 $1,725 Implemented
SD0454 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,512 $200 Implemented
SD0454 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,236 $2,700 Implemented
SD0454 # 03 Y:2012 03 2012 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $6,156 $2,000 Not Implemented
SD0454 # 04 Y:2012 04 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,354 $2,350 Not Implemented
SD0454 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $14,303 $13,546 Implemented
SD0454 # 06 Y:2012 06 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,826 $6,000 Not Implemented