IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
NAICS 3312 Steel Product Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2207 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,845 $30,000 Not Implemented
UL2207 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,572 $18,120 Not Implemented
UL2207 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,180 $0 Not Implemented
UL2207 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $178,671 $2,038,848 Not Implemented
UL2207 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,876 $0 Not Implemented
UL2207 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $135,226 $2,377,313 Not Implemented
UL2207 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,984 $83,246 Not Implemented
UK1801 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $2,773 $1,959 Implemented
UK1801 # 11 Y:2018 11 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,054 $0 Not Implemented
UK1801 # 10 Y:2018 10 2018 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,756 $5,475 Not Implemented
UK1801 # 09 Y:2018 09 2018 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,865 $5,895 Not Implemented
UK1801 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $8,475 $2,977 Not Implemented
UK1801 # 06 Y:2018 06 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $860 $1,250 Implemented
UK1801 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,263 $2,190 Implemented
UK1801 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,208 $48,400 Implemented
UK1801 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $3,719 $1,526 Not Implemented
UK1801 # 03 Y:2018 03 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $26,076 $3,990 Not Implemented
UK1801 # 04 Y:2018 04 2018 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $23,118 $11,500 Not Implemented
UK1403 # 12 Y:2014 12 2014 USE PHOTOCELL CONTROLS $3,867 $947 Implemented
UK1403 # 13 Y:2014 13 2014 UPGRADE CONTROLS ON COMPRESSORS $3,017 $0 Not Implemented
UK1403 # 11 Y:2014 11 2014 UPGRADE CONTROLS ON COMPRESSORS $14,129 $40,000 Not Implemented
UK1403 # 10 Y:2014 10 2014 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $250,000 $100,000 Not Implemented
UK1403 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50,851 $9,648 Implemented
UK1403 # 08 Y:2014 08 2014 MINIMIZE WATER USAGE $68,700 $5,200 Not Implemented
UK1403 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,517 $0 Not Implemented