IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

342

matching recommendations
Reset
NAICS 331210 Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0411 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $92 $200 Not Implemented
BD0343 # 01 Y:2008 01 2008 USE RADIANT HEATER FOR SPOT HEATING $10,631 $12,501 Not Implemented
BD0343 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,924 $6,730 Not Implemented
BD0343 # 03 Y:2008 03 2008 INSTALL SKYLIGHTS $693 $5,713 Not Implemented
BD0343 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $188 $405 Not Implemented
BD0343 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $788 $788 Not Implemented
BD0343 # 06 Y:2008 06 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,874 $9,167 Not Implemented
WV0331 # 01 Y:2006 01 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,465 $18,600 Not Implemented
WV0331 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $686 $440 Implemented
WV0331 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $778 $1,460 Implemented
WV0331 # 07 Y:2006 07 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,352 $1,000 Implemented
WV0331 # 06 Y:2006 06 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,523 $320 Implemented
WV0331 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,906 $1,560 Implemented
WV0331 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $3,957 $2,264 Implemented
WV0331 # 03 Y:2006 03 2006 REDUCE VENTILATION AIR $9,874 $3,940 Not Implemented
WV0331 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,865 $22,825 Implemented
WV0331 # 10 Y:2006 10 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $566 $1,370 Not Implemented
WV0331 # 11 Y:2006 11 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $438 $30 Not Implemented
WI0499 # 01 Y:2005 01 2005 MODIFY WORKLOAD $42,000 $3,600 Implemented
WI0499 # 02 Y:2005 02 2005 INSTALL TIMERS AND/OR THERMOSTATS $9,925 $600 Implemented
WI0499 # 03 Y:2005 03 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,400 $0 Not Implemented
WI0499 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,192 $22,500 Implemented
WI0499 # 05 Y:2005 05 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,285 $300 Implemented
WI0499 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $967 $1,280 Implemented
WI0499 # 07 Y:2005 07 2005 INSTALL SPECTRAL REFLECTORS / DELAMP $344 $0 Implemented