Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
684
matching recommendationsNAICS | 33122 | Rolling and Drawing of Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0817 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,120 | $0 | Implemented |
UD0817 # 10 Y:2010 | 10 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,001 | $2,366 | Not Implemented |
UD0817 # 11 Y:2010 | 11 | 2010 | USE OPTIMUM TEMPERATURE | $8,137 | $0 | Implemented |
UD0817 # 12 Y:2010 | 12 | 2010 | COVER OPEN TANKS | $10,386 | $0 | Implemented |
UD0817 # 13 Y:2010 | 13 | 2010 | INSULATE BARE EQUIPMENT | $21,893 | $0 | Implemented |
UD0817 # 14 Y:2010 | 14 | 2010 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $300 | $50 | Not Implemented |
UD0817 # 15 Y:2010 | 15 | 2010 | INSULATE BARE EQUIPMENT | $3,996 | $0 | Implemented |
UD0817 # 16 Y:2010 | 16 | 2010 | REDESIGN PROCESS | $357,330 | $0 | Not Implemented |
UD0817 # 17 Y:2010 | 17 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $18,312 | $36,624 | Not Implemented |
UM0365 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,536 | $77,254 | Implemented |
UM0365 # 02 Y:2010 | 02 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $15,991 | $107,000 | Implemented |
UM0365 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,966 | $13,000 | Implemented |
UM0365 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $1,051 | $0 | Implemented |
UM0365 # 05 Y:2010 | 05 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $43,773 | $13,000 | Implemented |
UM0365 # 06 Y:2010 | 06 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,455 | $3,500 | Implemented |
UM0365 # 07 Y:2010 | 07 | 2010 | USE OPTIMUM THICKNESS INSULATION | $1,040 | $22,500 | Implemented |
UM0365 # 08 Y:2010 | 08 | 2010 | INSTALL STORM WINDOWS AND DOORS | $819 | $0 | Not Implemented |
OK0785 # 01 Y:2010 | 01 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,282 | $55,440 | Implemented |
OK0785 # 02 Y:2010 | 02 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,202 | $3,000 | Not Implemented |
OK0785 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,225 | $56,686 | Not Implemented |
OK0785 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $644 | $5,222 | Not Implemented |
OK0785 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,602 | $0 | Implemented |
OK0785 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $563 | $0 | Implemented |
UD0811 # 01 Y:2010 | 01 | 2010 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $27,175 | $0 | Not Implemented |
UD0811 # 02 Y:2010 | 02 | 2010 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $7,064 | $13,132 | Not Implemented |