IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

668

matching recommendations
Reset
NAICS 33122 Rolling and Drawing of Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0961 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80,050 $185,484 Not Implemented
OK0961 # 03 Y:2017 03 2017 INSTALL SET-BACK TIMERS $605 $800 Not Implemented
OK0961 # 02 Y:2017 02 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,730 $400 Implemented
OK0961 # 01 Y:2017 01 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,024 $5,000 Not Implemented
UD0962 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,808 $5,292 Not Implemented
UD0962 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,049 $17,049 Not Implemented
UD0962 # 10 Y:2017 10 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,104 $1,000 Implemented
UD0962 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $7,630 $8,990 Implemented
UD0962 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,115 $20,000 Not Implemented
UD0962 # 05 Y:2017 05 2017 INSTALL AUTOMATIC STACK DAMPER $847 $1,050 Not Implemented
UD0962 # 04 Y:2017 04 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,906 $23,600 Not Implemented
UD0962 # 03 Y:2017 03 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,226 $3,000 Not Implemented
UD0962 # 02 Y:2017 02 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,791 $211,700 Implemented
UD0962 # 01 Y:2017 01 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $452 $300 Not Implemented
UD0946 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $214 $0 Not Implemented
UD0946 # 07 Y:2016 07 2016 DEVELOP A REPAIR/REPLACE POLICY $462 $2,400 Implemented
UD0946 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,478 $77,725 Not Implemented
UD0946 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $304 $0 Implemented
UD0946 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $3,057 $2,000 Not Implemented
UD0946 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $776 $400 Not Implemented
UD0946 # 02 Y:2016 02 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,148 $1,660 Not Implemented
UD0946 # 01 Y:2016 01 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,504 $500 Implemented
OR0668 # 01 Y:2016 01 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $64,602 $27,375 Not Implemented
OR0668 # 02 Y:2016 02 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,966 $1,900 Implemented
OR0668 # 03 Y:2016 03 2016 REDUCE FLUID FLOW RATES $9,090 $13,345 Implemented