Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
668
matching recommendationsNAICS | 33122 | Rolling and Drawing of Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0064 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,738 | $8,210 | Not Implemented |
WM0064 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,868 | $3,500 | Not Implemented |
WM0064 # 07 Y:2015 | 07 | 2015 | INSULATE BARE EQUIPMENT | $11,151 | $1,631 | Not Implemented |
WM0064 # 08 Y:2015 | 08 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $20,928 | $34,000 | Not Implemented |
LE0390 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,174 | $28 | Not Implemented |
LE0390 # 02 Y:2015 | 02 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,972 | $5,400 | Not Implemented |
LE0390 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,489 | $1,000 | Not Implemented |
LE0390 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $398 | $75 | Not Implemented |
LE0390 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $558 | $120 | Not Implemented |
LE0390 # 06 Y:2015 | 06 | 2015 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $47,479 | $25,500 | Implemented |
LE0390 # 07 Y:2015 | 07 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,361 | $2,457 | Not Implemented |
LE0390 # 08 Y:2015 | 08 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,333 | $5,028 | Not Implemented |
LE0390 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $3,974 | $7,332 | Not Implemented |
LE0390 # 10 Y:2015 | 10 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,602 | $5,200 | Not Implemented |
TT0142 # 02 Y:2014 | 02 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $299 | $596 | Not Implemented |
TT0142 # 01 Y:2014 | 01 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,305 | $1,400 | Implemented |
TT0142 # 06 Y:2014 | 06 | 2014 | USE PHOTOCELL CONTROLS | $49 | $45 | Implemented |
TT0142 # 05 Y:2014 | 05 | 2014 | DISCONNECT BALLASTS | $555 | $60 | Not Implemented |
TT0142 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,651 | $3,000 | Implemented |
TT0142 # 03 Y:2014 | 03 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $861 | $1,662 | Not Implemented |
NC0523 # 01 Y:2014 | 01 | 2014 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $156,000 | $600,000 | Not Implemented |
NC0523 # 02 Y:2014 | 02 | 2014 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $78,330 | $120,000 | Not Implemented |
NC0523 # 03 Y:2014 | 03 | 2014 | REPLACE BOILER | $58,620 | $90,000 | Not Implemented |
NC0523 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,419 | $146,762 | Not Implemented |
NC0523 # 05 Y:2014 | 05 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $8,560 | $2,500 | Not Implemented |