Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 33122 | Rolling and Drawing of Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0523 # 02 Y:2014 | 02 | 2014 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $78,330 | $120,000 | Not Implemented |
NC0523 # 14 Y:2014 | 14 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $2,088 | $4,256 | Not Implemented |
NC0523 # 13 Y:2014 | 13 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,803 | $1,935 | Implemented |
NC0523 # 12 Y:2014 | 12 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,179 | $50 | Implemented |
NC0523 # 11 Y:2014 | 11 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,120 | $1,000 | Implemented |
NC0523 # 10 Y:2014 | 10 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,411 | $12,000 | Not Implemented |
NC0523 # 09 Y:2014 | 09 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,387 | $20,000 | Not Implemented |
NC0523 # 08 Y:2014 | 08 | 2014 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $11,195 | $20,000 | Not Implemented |
NC0523 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $176 | $200 | Implemented |
NC0523 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $3,012 | Implemented |
NC0523 # 05 Y:2014 | 05 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $8,560 | $2,500 | Not Implemented |
NC0523 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,419 | $146,762 | Not Implemented |
NC0523 # 03 Y:2014 | 03 | 2014 | REPLACE BOILER | $58,620 | $90,000 | Not Implemented |
NC0523 # 01 Y:2014 | 01 | 2014 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $156,000 | $600,000 | Not Implemented |
NC0364 # 01 Y:2007 | 01 | 2007 | ADJUST BURNERS FOR EFFICIENT OPERATION | $51,254 | $6,000 | Implemented |
NC0364 # 02 Y:2007 | 02 | 2007 | ADOPT IN-HOUSE MATERIAL GENERATION | $43,536 | $125,000 | Not Implemented |
NC0364 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,464 | $46,995 | Not Implemented |
NC0364 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,004 | $50 | Implemented |
NC0364 # 05 Y:2007 | 05 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $870 | $863 | Implemented |
NC0364 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $684 | $500 | Implemented |
NC0364 # 07 Y:2007 | 07 | 2007 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $48,725 | $133,600 | Implemented |