Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsNAICS | 33122 | Rolling and Drawing of Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0798 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,000 | $0 | Implemented |
OK0798 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,120 | $1,991 | Implemented |
OK0798 # 10 Y:2010 | 10 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,239 | $11,718 | Not Implemented |
OK0798 # 01 Y:2010 | 01 | 2010 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $176,587 | $1,026,000 | Not Implemented |
OK0798 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,085 | $5,205 | Implemented |
OK0798 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $28,826 | $900 | Implemented |
OK0798 # 09 Y:2010 | 09 | 2010 | INSTALL SET-BACK TIMERS | $3,115 | $1,503 | Not Implemented |
OK0798 # 06 Y:2010 | 06 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,240 | $0 | Implemented |
OK0798 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $8,199 | $2,430 | Implemented |
OK0798 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,758 | $239,328 | Not Implemented |
OK0798 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $203 | $2,009 | Implemented |
UD0817 # 14 Y:2010 | 14 | 2010 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $300 | $50 | Not Implemented |
UD0817 # 13 Y:2010 | 13 | 2010 | INSULATE BARE EQUIPMENT | $21,893 | $0 | Implemented |
UD0817 # 12 Y:2010 | 12 | 2010 | COVER OPEN TANKS | $10,386 | $0 | Implemented |
UD0817 # 11 Y:2010 | 11 | 2010 | USE OPTIMUM TEMPERATURE | $8,137 | $0 | Implemented |
UD0817 # 15 Y:2010 | 15 | 2010 | INSULATE BARE EQUIPMENT | $3,996 | $0 | Implemented |
UD0817 # 10 Y:2010 | 10 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,001 | $2,366 | Not Implemented |
UD0817 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,120 | $0 | Implemented |
UD0817 # 08 Y:2010 | 08 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,696 | $2,250 | Not Implemented |
UD0817 # 07 Y:2010 | 07 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $628 | $0 | Implemented |
UD0817 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,364 | $1,876 | Not Implemented |
UD0817 # 03 Y:2010 | 03 | 2010 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $9,387 | $0 | Not Implemented |
UD0817 # 02 Y:2010 | 02 | 2010 | OPTIMIZE PLANT POWER FACTOR | $63,586 | $41,250 | Not Implemented |
UD0817 # 01 Y:2010 | 01 | 2010 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $66,672 | $600 | Implemented |
UD0817 # 17 Y:2010 | 17 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $18,312 | $36,624 | Not Implemented |