IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 33122 Rolling and Drawing of Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0946 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $214 $0 Not Implemented
UD0946 # 07 Y:2016 07 2016 DEVELOP A REPAIR/REPLACE POLICY $462 $2,400 Implemented
UD0946 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,478 $77,725 Not Implemented
UD0946 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $304 $0 Implemented
UD0946 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $3,057 $2,000 Not Implemented
UD0946 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $776 $400 Not Implemented
UD0946 # 02 Y:2016 02 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,148 $1,660 Not Implemented
UD0946 # 01 Y:2016 01 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,504 $500 Implemented
OR0668 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $20,693 $21,375 Not Implemented
OR0668 # 08 Y:2016 08 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $40,925 $70,000 Not Implemented
OR0668 # 07 Y:2016 07 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $131,042 $638,642 Not Implemented
OR0668 # 06 Y:2016 06 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $20,233 $54,456 Not Implemented
OR0668 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,529 $42,750 Not Implemented
OR0668 # 03 Y:2016 03 2016 REDUCE FLUID FLOW RATES $9,090 $13,345 Implemented
OR0668 # 02 Y:2016 02 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,966 $1,900 Implemented
OR0668 # 01 Y:2016 01 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $64,602 $27,375 Not Implemented
OK0931 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $3,798 $23,574 Not Implemented
OK0931 # 09 Y:2016 09 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $143 $182 Not Implemented
OK0931 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,151 $1,256 Not Implemented
OK0931 # 07 Y:2016 07 2016 USE RADIANT HEATER FOR SPOT HEATING $2,973 $11,940 Not Implemented
OK0931 # 06 Y:2016 06 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,555 $1,498 Implemented
OK0931 # 05 Y:2016 05 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,235 $590 Implemented
OK0931 # 04 Y:2016 04 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,634 $8,294 Not Implemented
OK0931 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,661 $28,728 Not Implemented
OK0931 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,893 $11,689 Not Implemented