Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
NAICS 331221 Rolled Steel Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0332 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $706 $4,580 Not Implemented
LE0332 # 01 Y:2012 01 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $66,813 $0 Not Implemented
LE0332 # 02 Y:2012 02 2012 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $16,976 $7,660 Not Implemented
LE0332 # 03 Y:2012 03 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,677 $25,375 Not Implemented
LE0332 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $9,659 $24,370 Not Implemented
LE0332 # 05 Y:2012 05 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,856 $28,000 Not Implemented
LE0332 # 06 Y:2012 06 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,328 $23,400 Not Implemented
LE0332 # 07 Y:2012 07 2012 DEVELOP STANDARD OPERATING PROCEDURES $6,689 $0 Implemented
LE0332 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,829 $40 Implemented
LE0332 # 09 Y:2012 09 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,360 $6,400 Not Implemented
LE0283 # 12 Y:2009 12 2009 COVER OPEN TANKS $9,339 $10,000 Implemented
LE0283 # 11 Y:2009 11 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $18,031 $30,000 Implemented
LE0283 # 13 Y:2009 13 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,598 $2,400 Not Implemented
LE0283 # 14 Y:2009 14 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,947 $7,000 Not Implemented
LE0283 # 15 Y:2009 15 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,465 $160 Not Implemented
LE0283 # 16 Y:2009 16 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,319 $800 Not Implemented
LE0283 # 17 Y:2009 17 2009 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,129 $600 Not Implemented
LE0283 # 18 Y:2009 18 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,121 $1,000 Not Implemented
LE0283 # 19 Y:2009 19 2009 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $1,040 $600 Not Implemented
LE0283 # 20 Y:2009 20 2009 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $718 $300 Not Implemented
LE0283 # 21 Y:2009 21 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $608 $565 Not Implemented
LE0283 # 22 Y:2009 22 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $312 $240 Not Implemented
LE0283 # 23 Y:2009 23 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,799 $32,466 Implemented
LE0283 # 24 Y:2009 24 2009 INSTALL OCCUPANCY SENSORS $550 $600 Implemented
LE0283 # 10 Y:2009 10 2009 REPLACE BOILER $19,000 $30,000 Not Implemented