IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

335

matching recommendations
Reset
NAICS 331222 Steel Wire Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0961 # 09 Y:2017 09 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $50,374 $124,000 Not Implemented
OK0961 # 08 Y:2017 08 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,104 $792 Not Implemented
OK0961 # 07 Y:2017 07 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $216,378 $7,000 Not Implemented
OK0961 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $831 $3,220 Not Implemented
OK0961 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,978 $7,268 Not Implemented
OK0961 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80,050 $185,484 Not Implemented
OK0961 # 03 Y:2017 03 2017 INSTALL SET-BACK TIMERS $605 $800 Not Implemented
OK0961 # 02 Y:2017 02 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,730 $400 Implemented
OK0961 # 01 Y:2017 01 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,024 $5,000 Not Implemented
LE0406 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,200 $0 Implemented
LE0406 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $896 $250 Not Implemented
LE0406 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,001 $300 Implemented
LE0406 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,582 $1,000 Implemented
LE0406 # 07 Y:2015 07 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,691 $65,000 Implemented
LE0406 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $6,858 $8,310 Implemented
LE0406 # 05 Y:2015 05 2015 OPTIMIZE PLANT POWER FACTOR $4,279 $2,920 Not Implemented
LE0390 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,174 $28 Not Implemented
LE0390 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,972 $5,400 Not Implemented
LE0390 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,489 $1,000 Not Implemented
LE0390 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $398 $75 Not Implemented
LE0390 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $558 $120 Not Implemented
LE0390 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,333 $5,028 Not Implemented
LE0390 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,361 $2,457 Not Implemented
LE0390 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $3,974 $7,332 Not Implemented
LE0390 # 10 Y:2015 10 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,602 $5,200 Not Implemented