IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 331222 Steel Wire Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0961 # 14 Y:2017 14 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $497,839 $3,000,000 Not Implemented
OK0961 # 08 Y:2017 08 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,104 $792 Not Implemented
OK0961 # 07 Y:2017 07 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $216,378 $7,000 Not Implemented
OK0961 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $831 $3,220 Not Implemented
OK0961 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,978 $7,268 Not Implemented
OK0961 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80,050 $185,484 Not Implemented
OK0961 # 03 Y:2017 03 2017 INSTALL SET-BACK TIMERS $605 $800 Not Implemented
OK0961 # 02 Y:2017 02 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,730 $400 Implemented
OK0961 # 01 Y:2017 01 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,024 $5,000 Not Implemented
OK0961 # 11 Y:2017 11 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $44,544 $8,817 Not Implemented
OK0961 # 12 Y:2017 12 2017 REUSE RICH WHITE WATER IN OTHER APPLICATIONS $523,580 $500,000 Not Implemented
OK0961 # 10 Y:2017 10 2017 COVER OPEN TANKS $27,427 $3,900 Not Implemented
OK0961 # 13 Y:2017 13 2017 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $311,801 $1,832,665 Not Implemented
OK0961 # 09 Y:2017 09 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $50,374 $124,000 Not Implemented
OK0798 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,120 $1,991 Implemented
OK0798 # 01 Y:2010 01 2010 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $176,587 $1,026,000 Not Implemented
OK0798 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,758 $239,328 Not Implemented
OK0798 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,085 $5,205 Implemented
OK0798 # 10 Y:2010 10 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,239 $11,718 Not Implemented
OK0798 # 09 Y:2010 09 2010 INSTALL SET-BACK TIMERS $3,115 $1,503 Not Implemented
OK0798 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $8,199 $2,430 Implemented
OK0798 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,000 $0 Implemented
OK0798 # 06 Y:2010 06 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,240 $0 Implemented
OK0798 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,826 $900 Implemented
OK0798 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $203 $2,009 Implemented