Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsNAICS | 331222 | Steel Wire Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0961 # 14 Y:2017 | 14 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $497,839 | $3,000,000 | Not Implemented |
OK0961 # 13 Y:2017 | 13 | 2017 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $311,801 | $1,832,665 | Not Implemented |
OK0961 # 12 Y:2017 | 12 | 2017 | REUSE RICH WHITE WATER IN OTHER APPLICATIONS | $523,580 | $500,000 | Not Implemented |
OK0961 # 11 Y:2017 | 11 | 2017 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $44,544 | $8,817 | Not Implemented |
OK0961 # 10 Y:2017 | 10 | 2017 | COVER OPEN TANKS | $27,427 | $3,900 | Not Implemented |
OK0961 # 09 Y:2017 | 09 | 2017 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $50,374 | $124,000 | Not Implemented |
OK0961 # 08 Y:2017 | 08 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,104 | $792 | Not Implemented |
OK0961 # 07 Y:2017 | 07 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $216,378 | $7,000 | Not Implemented |
OK0961 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $831 | $3,220 | Not Implemented |
OK0961 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,978 | $7,268 | Not Implemented |
OK0961 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $80,050 | $185,484 | Not Implemented |
OK0961 # 03 Y:2017 | 03 | 2017 | INSTALL SET-BACK TIMERS | $605 | $800 | Not Implemented |
OK0961 # 02 Y:2017 | 02 | 2017 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,730 | $400 | Implemented |
OK0961 # 01 Y:2017 | 01 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,024 | $5,000 | Not Implemented |
OK0798 # 10 Y:2010 | 10 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,239 | $11,718 | Not Implemented |
OK0798 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,120 | $1,991 | Implemented |
OK0798 # 09 Y:2010 | 09 | 2010 | INSTALL SET-BACK TIMERS | $3,115 | $1,503 | Not Implemented |
OK0798 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $8,199 | $2,430 | Implemented |
OK0798 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,000 | $0 | Implemented |
OK0798 # 06 Y:2010 | 06 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,240 | $0 | Implemented |
OK0798 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $28,826 | $900 | Implemented |
OK0798 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $203 | $2,009 | Implemented |
OK0798 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,085 | $5,205 | Implemented |
OK0798 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,758 | $239,328 | Not Implemented |
OK0798 # 01 Y:2010 | 01 | 2010 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $176,587 | $1,026,000 | Not Implemented |