Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsNAICS | 3313 | Alumina and Aluminum Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1508 # 04 Y:2015 | 04 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,550 | $15,020 | Not Implemented |
UK1508 # 11 Y:2015 | 11 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,700 | $1,700 | Implemented |
UK1508 # 03 Y:2015 | 03 | 2015 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $18,758 | $63,200 | Not Implemented |
UK1508 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $1,722 | $193 | Implemented |
UK1508 # 09 Y:2015 | 09 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $716 | $0 | Not Implemented |
UK1508 # 05 Y:2015 | 05 | 2015 | ADD AREA LIGHTING SWITCHES | $909 | $785 | Not Implemented |
UK1508 # 14 Y:2015 | 14 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,224 | $13,658 | Not Implemented |
UK1508 # 10 Y:2015 | 10 | 2015 | INSTALL COMMON HEADER ON COMPRESSORS | $4,650 | $2,950 | Implemented |
UK1508 # 02 Y:2015 | 02 | 2015 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $14,085 | $9,000 | Not Implemented |
UK1508 # 13 Y:2015 | 13 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,138 | $12,000 | Implemented |
UK1508 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $2,923 | $7,872 | Not Implemented |
UK1508 # 08 Y:2015 | 08 | 2015 | UPGRADE OBSOLETE EQUIPMENT | $1,302 | $746 | Implemented |
UK1508 # 12 Y:2015 | 12 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,063 | $3,260 | Implemented |
UK1508 # 01 Y:2015 | 01 | 2015 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $911 | $290 | Not Implemented |
UD0888 # 14 Y:2013 | 14 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $3,770 | $0 | Implemented |
UK1313 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $841 | $0 | Implemented |
UK1313 # 03 Y:2013 | 03 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $23,080 | $10,000 | Implemented |
UK1313 # 04 Y:2013 | 04 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,510 | $5,000 | Implemented |
UD0888 # 19 Y:2013 | 19 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $262,538 | $700,000 | Not Implemented |
UD0888 # 13 Y:2013 | 13 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,444 | $4,500 | Not Implemented |
UD0888 # 12 Y:2013 | 12 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $20,092 | $0 | Implemented |
UD0888 # 11 Y:2013 | 11 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,284 | $15,000 | Implemented |
UD0888 # 08 Y:2013 | 08 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,313 | $0 | Implemented |
UD0888 # 06 Y:2013 | 06 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $74,025 | $55,000 | Not Implemented |
UD0888 # 05 Y:2013 | 05 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,528 | $0 | Not Implemented |