IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

780

matching recommendations
Reset
NAICS 33131 Alumina and Aluminum Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0126 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,531 $32,100 Not Implemented
MZ0126 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $3,501 $780 Implemented
MZ0126 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,939 $770 Not Implemented
MZ0126 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $328 $575 Not Implemented
MZ0120 # 01 Y:2013 01 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,136 $119,770 Implemented
MZ0120 # 02 Y:2013 02 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $35,241 $75,000 Not Implemented
MZ0120 # 03 Y:2013 03 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,557 $31,200 Implemented
MZ0120 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $153 $190 Implemented
MZ0120 # 05 Y:2013 05 2013 USE COMPRESSOR AIR FILTERS $4,675 $1,100 Implemented
UM0417 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,780 $58,125 Implemented
UM0417 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $2,390 $3,500 Not Implemented
UM0417 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,907 $5,000 Not Implemented
UM0417 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,038 $200 Not Implemented
UM0417 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $6,000 $200 Implemented
UM0417 # 06 Y:2012 06 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $305 $100 Not Implemented
UM0417 # 07 Y:2012 07 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,464 $35,000 Not Implemented
UM0417 # 08 Y:2012 08 2012 RECOVER WASTE HEAT FROM EQUIPMENT $5,721 $500 Not Implemented
UMS013 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $320,000 $600,000 Not Implemented
UMS013 # 02 Y:2012 02 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $106,000 $200,000 Not Implemented
UMS013 # 03 Y:2012 03 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $673,000 $1,000,000 Not Implemented
UMS013 # 04 Y:2012 04 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $465,000 $700,000 Not Implemented
UMS013 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $137,000 $0 Not Implemented
OR0592 # 01 Y:2012 01 2012 REDUCE SCRAP PRODUCTION $413,713 $260,000 Not Implemented
OR0592 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,815 $42,303 Not Implemented
OR0592 # 03 Y:2012 03 2012 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $40,400 $70,000 Implemented