IAC logo
IAC Assessment: UD0888
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0888
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2013
Principal Product Aluminum
NAICS 331314 - Secondary Smelting and Alloying of Aluminum
SIC 3341 - Secondary Nonferrous Metals
Sales >$500,000,000
# of Employees 125
Plant Area (Sq.Ft.) 215,000
Annual Production 650,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,874,900 41,952,645 kWh $0.04
Electricity Demand $531,844 74,906 kW-months/year $7.10
Electricity Fees $330,390 - $ -
Natural Gas $3,011,174 977,916 MMBtu $3.08
TOTAL ENERGY COSTS $5,943,943
RECOMMENDED SAVINGS* $460,522 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,275
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$396
Cost:
$5,000
$396 8,794 - - - - - - $396
8,794
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$841
Cost:
-
$841 18,693 - - - - - - $841
18,693
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$23,080
Cost:
$10,000
$23,080 512,888 - - - - - - $23,080
512,888
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,510
Cost:
$5,000
$3,510 77,997 - - - - - - $3,510
77,997
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,528
Cost:
-
$4,511 100,247 $1,017 143 - - - - $4,511
100,247
kWh
$1,017
143
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$74,025
Cost:
$55,000
- - - - - - $74,025 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$74,025
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,011
Cost:
-
$7,011 155,805 - - - - - - $7,011
155,805
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,313
Cost:
-
$2,313 51,393 - - - - - - $2,313
51,393
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,246
Cost:
$3,000
$6,755 150,116 $1,491 210 - - - - $6,755
150,116
kWh
$1,491
210
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$695
Cost:
-
$567 12,600 $128 18 - - - - $567
12,600
kWh
$128
18
kW-months/year
-
-
MMBtu
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,284
Cost:
$15,000
$107 2,373 $23 3 - - $2,154 - $107
2,373
kWh
$23
3
kW-months/year
-
-
MMBtu
$2,154
-
$
12: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$20,092
Cost:
-
$20,092 446,481 - - - - - - $20,092
446,481
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
13: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$10,444
Cost:
$4,500
$10,444 232,076 - - - - - - $10,444
232,076
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
14: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,770
Cost:
-
$3,028 67,773 $742 105 - - - - $3,028
67,773
kWh
$742
105
kW-months/year
-
-
MMBtu
-
-
$
15: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$913
Cost:
$2,119
$749 16,644 $164 23 - - - - $749
16,644
kWh
$164
23
kW-months/year
-
-
MMBtu
-
-
$
16: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,807
Cost:
$894
- - - - $6,807 2,210 - - -
-
kWh
-
-
kW-months/year
$6,807
2,210
MMBtu
-
-
$
17: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$1,679
Cost:
$5,000
- - - - $1,679 545 - - -
-
kWh
-
-
kW-months/year
$1,679
545
MMBtu
-
-
$
18: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$21,538
Cost:
$2,500
- - - - $21,538 6,993 - - -
-
kWh
-
-
kW-months/year
$21,538
6,993
MMBtu
-
-
$
19: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$262,538
Cost:
$700,000
- - - - $262,538 85,240 - - -
-
kWh
-
-
kW-months/year
$262,538
85,240
MMBtu
-
-
$
20: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$412
Cost:
-
- - - - $412 134 - - -
-
kWh
-
-
kW-months/year
$412
134
MMBtu
-
-
$
21: 3.1193 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING Savings:
$4,400
Cost:
-
- - - - $4,400 1,440 - - -
-
kWh
-
-
kW-months/year
$4,400
1,440
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$460,522
Cost:
$808,013
$83,404 1,853,880 $3,565 502 $297,374 96,562 $76,179 - $83,404
1,853,880
kWh
$3,565
502
kW-months/year
$297,374
96,562
MMBtu
$76,179
-
$
TOTAL IMPLEMENTED Savings:
$53,275
Cost:
$28,000
$44,053 979,425 $2,256 318 $4,812 1,574 $2,154 - $44,053
979,425
kWh
$2,256
318
kW-months/year
$4,812
1,574
MMBtu
$2,154
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes