IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

783

matching recommendations
Reset
NAICS 33131 Alumina and Aluminum Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0261 # 02 Y:2007 02 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $71,526 $75,000 Not Implemented
LE0261 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,454 $12,000 Not Implemented
LE0261 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,461 $20 Implemented
LE0261 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,661 $100 Implemented
LE0261 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,137 $5,000 Not Implemented
LE0261 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,155 $1,500 Implemented
LE0261 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,476 $150 Implemented
LE0261 # 09 Y:2007 09 2007 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,985 $300 Not Implemented
TT0005 # 01 Y:2007 01 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,913 $7,515 Not Implemented
TT0005 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,570 $4,816 Implemented
TT0005 # 03 Y:2007 03 2007 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,206 $400 Not Implemented
TT0005 # 04 Y:2007 04 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $864 $4,080 Not Implemented
TT0005 # 05 Y:2007 05 2007 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,002 $200 Implemented
TT0005 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $62,060 $50,000 Implemented
TT0005 # 07 Y:2007 07 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,808 $5,060 Not Implemented
TT0005 # 08 Y:2007 08 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $47,304 $2,000 Implemented
TT0005 # 09 Y:2007 09 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,245 $44,608 Not Implemented
LM0125 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,003 $2,604 Implemented
LM0125 # 02 Y:2007 02 2007 $20,000 $20,000 Not Implemented
LM0125 # 03 Y:2007 03 2007 $89,704 $11,000 Implemented
LM0125 # 04 Y:2007 04 2007 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $62,618 $40,000 Not Implemented
TA0126 # 01 Y:2006 01 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $8,070 $3,858 Implemented
TA0126 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,660 $1,120 Implemented
TA0126 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,950 $0 Implemented
TA0126 # 04 Y:2006 04 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,528 $0 Implemented