IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

791

matching recommendations
Reset
NAICS 33131 Alumina and Aluminum Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0967 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $237,120 $2,593,008 Not Implemented
GT0967 # 05 Y:2023 05 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,843 $24,000 Not Implemented
GT0967 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $968 $576 Implemented
GT0967 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,800 $1,000 Implemented
GT0967 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,377 $1,850 Implemented
GT0967 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $23,763 $800 Implemented
UF0596 # 11 Y:2023 11 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,156 $2,352 Implemented
UF0596 # 10 Y:2023 10 2023 IMPROVE SPACE COMFORT CONDITIONING $26,447 $4,768 Implemented
UF0596 # 09 Y:2023 09 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,289 $25,440 Implemented
UF0596 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,499 $1,399 Implemented
UF0596 # 07 Y:2023 07 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $47,000 $171,903 Implemented
UF0596 # 06 Y:2023 06 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $50,904 $49,563 Implemented
UF0596 # 05 Y:2023 05 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $145,162 $141,225 Implemented
UF0596 # 04 Y:2023 04 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $213,087 $0 Implemented
UF0596 # 03 Y:2023 03 2023 DIRECT WARMEST AIR TO COMBUSTION INTAKE $232,670 $300,000 Implemented
UF0596 # 02 Y:2023 02 2023 INSTALL SUB-METERING EQUIPMENT $266,539 $15,232 Implemented
UF0596 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,546,439 $3,990,000 Not Implemented
AM0874 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,860 $3,000 Implemented
AM0874 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,060 $430 Implemented
AM0874 # 03 Y:2023 03 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,850 $4,340 Implemented
AM0874 # 04 Y:2023 04 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $49,585 $3,600 Implemented
AM0874 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,970 $18 Implemented
AM0874 # 06 Y:2023 06 2023 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,900 $35 Not Implemented
AM0874 # 07 Y:2023 07 2023 USE PHOTOCELL CONTROLS $1,050 $960 Implemented
WM0194 # 09 Y:2023 09 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $9,970 $2,832 Implemented