Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
85
matching recommendationsNAICS | 331313 | Alumina Refining and Primary Aluminum Production |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0993 # 11 Y:2025 | 11 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $162,880 | $1,659,784 | n/a |
GT0993 # 10 Y:2025 | 10 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,294 | $26,910 | n/a |
GT0993 # 09 Y:2025 | 09 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $89 | $363 | n/a |
GT0993 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $27,885 | $200 | n/a |
GT0993 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,903 | $200 | n/a |
GT0993 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,254 | $1,850 | n/a |
GT0993 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,579 | $600 | n/a |
GT0993 # 05 Y:2025 | 05 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,717 | $1,200 | n/a |
GT0993 # 06 Y:2025 | 06 | 2025 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $916 | $788 | n/a |
GT0993 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $643 | $600 | n/a |
GT0993 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $2,306 | $2,763 | n/a |
UL2417 # 04 Y:2024 | 04 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,595 | $5,797 | n/a |
UL2417 # 07 Y:2024 | 07 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $900 | $0 | n/a |
UL2417 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,850 | $39,000 | n/a |
UL2417 # 02 Y:2024 | 02 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $12,753 | $43,234 | n/a |
UL2417 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,561 | $524,124 | n/a |
UL2417 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $463 | $0 | n/a |
UL2417 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $438 | $941 | n/a |
UL2417 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,025 | $525 | n/a |
LT8409 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,962 | $23,656 | n/a |
LT8409 # 02 Y:2024 | 02 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $38,595 | $8,887 | n/a |
LT8409 # 03 Y:2024 | 03 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $38,478 | $2,971 | n/a |
GT0936 # 06 Y:2019 | 06 | 2019 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $19,169 | $14,400 | Not Implemented |
GT0936 # 05 Y:2019 | 05 | 2019 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,489 | $1,020 | Not Implemented |
GT0936 # 02 Y:2019 | 02 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $17,484 | $2,000 | Implemented |