IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
NAICS 331313 Alumina Refining and Primary Aluminum Production
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0044 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,991 $38,600 Implemented
MZ0044 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $5,600 Implemented
MZ0044 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $802 $460 Not Implemented
MZ0044 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,600 $850 Implemented
MZ0044 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,268 $0 Not Implemented
MZ0044 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $11,155 $10,000 Not Implemented
UA0016 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,808 $460 Not Implemented
UA0016 # 06 Y:2008 06 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $30,000 $50,000 Not Implemented
UA0016 # 04 Y:2008 04 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $171,000 $95,000 Not Implemented
UA0016 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,135 $2,000 Not Implemented
UA0016 # 02 Y:2008 02 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,023 $20,000 Not Implemented
UA0016 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $60,322 $10,000 Implemented
UA0016 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $52,000 $150,000 Not Implemented
MI0067 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $1,681 $17 Implemented
MI0067 # 01 Y:2003 01 2003 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $420 $726 Implemented
MI0067 # 03 Y:2003 03 2003 COVER OPEN TANKS $62 $120 Implemented
MI0067 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $75 $267 Not Implemented
MI0067 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $9,230 $175 Not Implemented
WV0257 # 14 Y:2003 14 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $954 $110 Implemented
WV0257 # 13 Y:2003 13 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $538 $2,900 Implemented
WV0257 # 12 Y:2003 12 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $19,542 $1,375 Implemented
WV0257 # 11 Y:2003 11 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,974 $6,300 Implemented
WV0257 # 10 Y:2003 10 2003 RECOVER WASTE HEAT FROM EQUIPMENT $47,961 $101,667 Not Implemented
WV0257 # 09 Y:2003 09 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $37,016 $1,000 Implemented
WV0257 # 08 Y:2003 08 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $159,962 $19,820 Not Implemented