IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

193

matching recommendations
Reset
NAICS 331314 Secondary Smelting and Alloying of Aluminum
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1313 # 15 Y:2013 15 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $913 $2,119 Not Implemented
UK1313 # 16 Y:2013 16 2013 INSULATE BARE EQUIPMENT $6,807 $894 Not Implemented
UK1313 # 17 Y:2013 17 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,679 $5,000 Not Implemented
UK1313 # 18 Y:2013 18 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $21,538 $2,500 Not Implemented
UK1313 # 19 Y:2013 19 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $252,538 $210,000 Implemented
UK1313 # 20 Y:2013 20 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $412 $0 Implemented
UK1313 # 21 Y:2013 21 2013 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $4,400 $0 Implemented
MZ0126 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,531 $32,100 Not Implemented
MZ0126 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $3,501 $780 Implemented
MZ0126 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,939 $770 Not Implemented
MZ0126 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $328 $575 Not Implemented
WV0438 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,104 $107,167 Not Implemented
WV0438 # 02 Y:2011 02 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $26,986 $25,242 Not Implemented
WV0438 # 03 Y:2011 03 2011 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $23,750 $68,377 Not Implemented
WV0438 # 04 Y:2011 04 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $14,539 $4,000 Implemented
WV0438 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,808 $24,313 Implemented
WV0438 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $10,092 $2,424 Not Implemented
WV0438 # 07 Y:2011 07 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,963 $2,000 Implemented
WV0438 # 08 Y:2011 08 2011 DEVELOP A REPAIR/REPLACE POLICY $8,588 $629 Implemented
WV0438 # 09 Y:2011 09 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,774 $648 Not Implemented
WV0438 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,332 $359 Implemented
WV0438 # 11 Y:2011 11 2011 INSTALL SET-BACK TIMERS $927 $617 Not Implemented
UM0378 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,490 $31,638 Implemented
UM0378 # 02 Y:2010 02 2010 UPGRADE CONTROLS ON COMPRESSORS $2,693 $3,996 Implemented
UM0378 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $755 $1,000 Implemented