Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
67
matching recommendationsNAICS | 331315 | Aluminum Sheet, Plate, and Foil Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2408 # 01 Y:2024 | 01 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $77,905 | $42,617 | n/a |
UL2408 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $319,482 | $2,990,386 | n/a |
UL2408 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,749 | $39,000 | n/a |
AS0565 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $139,376 | $1,265,613 | Implemented |
AS0565 # 03 Y:2023 | 03 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $89,587 | $918,750 | Not Implemented |
AS0565 # 04 Y:2023 | 04 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,687 | $3,351 | Not Implemented |
AS0565 # 05 Y:2023 | 05 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $1,336 | $75 | Implemented |
AS0565 # 06 Y:2023 | 06 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $617 | $312 | Not Implemented |
AS0565 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $454 | $720 | Implemented |
AS0565 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $583,260 | $500 | Implemented |
MZ0352 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,256 | $56,316 | Implemented |
MZ0352 # 09 Y:2023 | 09 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,760 | $3,671 | Implemented |
MZ0352 # 11 Y:2023 | 11 | 2023 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $109,087 | $116,979 | Not Implemented |
MZ0352 # 12 Y:2023 | 12 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $213,792 | $1,700,000 | Not Implemented |
MZ0352 # 10 Y:2023 | 10 | 2023 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $49,532 | $3,900 | Implemented |
MZ0352 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,512 | $15,473 | Implemented |
MZ0352 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,053 | $160 | Implemented |
MZ0352 # 08 Y:2023 | 08 | 2023 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $38,678 | $132,100 | Implemented |
MZ0352 # 07 Y:2023 | 07 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,709 | $750 | Implemented |
MZ0352 # 03 Y:2023 | 03 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,627 | $2,400 | Implemented |
MZ0352 # 04 Y:2023 | 04 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,502 | $320 | Implemented |
MZ0352 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,882 | $315 | Implemented |
OR0716 # 01 Y:2019 | 01 | 2019 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $170,737 | $8,015 | Not Implemented |
OR0716 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,971 | $1,200 | Implemented |
OR0716 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $9,287 | $19,796 | Not Implemented |