Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
455
matching recommendationsNAICS | 331318 | Other Aluminum Rolling, Drawing, and Extruding |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0225 # 01 Y:2023 | 01 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,327 | $0 | n/a |
DL0225 # 02 Y:2023 | 02 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,327 | $0 | n/a |
DL0225 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,072 | $500 | n/a |
DL0225 # 04 Y:2023 | 04 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $15,801 | $4,102 | n/a |
DL0225 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,896 | $0 | n/a |
DL0225 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $4,181 | $6,480 | n/a |
DL0225 # 07 Y:2023 | 07 | 2023 | IMPROVE HANDLING PRACTICES | $25,825 | $10,000 | n/a |
DL0225 # 08 Y:2023 | 08 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,068 | $28,750 | n/a |
DL0225 # 09 Y:2023 | 09 | 2023 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $18,229 | $60,000 | n/a |
MU0033 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,285 | $5,918 | n/a |
MU0033 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $814 | $270 | n/a |
MU0033 # 01 Y:2023 | 01 | 2023 | INSULATE BARE EQUIPMENT | $1,490 | $18 | n/a |
MU0033 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $872 | $524 | n/a |
MU0033 # 04 Y:2023 | 04 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,201 | $0 | n/a |
GT0967 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $48,377 | $1,850 | Implemented |
GT0967 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $23,763 | $800 | Implemented |
GT0967 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $237,120 | $2,593,008 | Not Implemented |
GT0967 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,800 | $1,000 | Implemented |
GT0967 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $968 | $576 | Implemented |
GT0967 # 07 Y:2023 | 07 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,881 | $13,403 | Not Implemented |
GT0967 # 05 Y:2023 | 05 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,843 | $24,000 | Not Implemented |
UF0596 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,546,439 | $3,990,000 | Not Implemented |
UF0596 # 02 Y:2023 | 02 | 2023 | INSTALL SUB-METERING EQUIPMENT | $266,539 | $15,232 | Implemented |
UF0596 # 03 Y:2023 | 03 | 2023 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $232,670 | $300,000 | Implemented |
UF0596 # 04 Y:2023 | 04 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $213,087 | $0 | Implemented |