IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

460

matching recommendations
Reset
NAICS 331318 Other Aluminum Rolling, Drawing, and Extruding
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0026 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,160 $5,609 n/a
NT0026 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,341 $0 n/a
NT0026 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $109,656 $54,987 n/a
NT0026 # 05 Y:2024 05 2024 APPLY FOR INVESTMENT INCENTIVES $133,205 $0 n/a
NT0026 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $122,072 $90,330 n/a
DL0225 # 04 Y:2023 04 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $15,801 $4,102 Not Implemented
DL0225 # 09 Y:2023 09 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $18,229 $60,000 Not Implemented
DL0225 # 08 Y:2023 08 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,068 $28,750 Implemented
DL0225 # 07 Y:2023 07 2023 IMPROVE HANDLING PRACTICES $25,825 $10,000 Implemented
DL0225 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $4,181 $6,480 Not Implemented
DL0225 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,896 $0 Not Implemented
DL0225 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,072 $500 Implemented
DL0225 # 02 Y:2023 02 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,327 $0 Implemented
DL0225 # 01 Y:2023 01 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,327 $0 Implemented
MU0033 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,285 $5,918 Not Implemented
MU0033 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $1,490 $18 Not Implemented
MU0033 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $814 $270 Not Implemented
MU0033 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $872 $524 Not Implemented
MU0033 # 04 Y:2023 04 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,201 $0 Not Implemented
GT0967 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,377 $1,850 Implemented
GT0967 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $23,763 $800 Implemented
GT0967 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $237,120 $2,593,008 Not Implemented
GT0967 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,800 $1,000 Implemented
GT0967 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $968 $576 Implemented
GT0967 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $2,881 $13,403 Not Implemented