Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
594
matching recommendationsNAICS | 3314 | Nonferrous Metal (except Aluminum) Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0007 # 03 Y:2007 | 03 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $533 | $0 | Implemented |
MZ0007 # 04 Y:2007 | 04 | 2007 | DISCONNECT BALLASTS | $27,567 | $1,310 | Implemented |
MZ0007 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $5,535 | $3,250 | Implemented |
MA0620 # 01 Y:2007 | 01 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $84,828 | $100,250 | Not Implemented |
MA0620 # 02 Y:2007 | 02 | 2007 | HEAT WATER WITH EXHAUST HEAT | $25,021 | $44,540 | Implemented |
MA0620 # 03 Y:2007 | 03 | 2007 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $23,390 | $85,000 | Not Implemented |
MA0620 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,535 | $24,820 | Implemented |
MA0620 # 05 Y:2007 | 05 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $9,514 | $1,776 | Implemented |
MA0620 # 06 Y:2007 | 06 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,532 | $8,100 | Implemented |
MA0620 # 07 Y:2007 | 07 | 2007 | USE RADIANT HEATER FOR SPOT HEATING | $7,012 | $10,990 | Not Implemented |
MA0620 # 08 Y:2007 | 08 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,784 | $20,175 | Not Implemented |
MA0620 # 09 Y:2007 | 09 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,751 | $3,025 | Implemented |
MA0620 # 10 Y:2007 | 10 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,323 | $6,022 | Implemented |
SF0341 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,716 | $0 | Implemented |
SF0341 # 02 Y:2007 | 02 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $2,998 | $0 | Not Implemented |
SF0341 # 03 Y:2007 | 03 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $529 | $0 | Implemented |
SF0341 # 04 Y:2007 | 04 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,392 | $919 | Implemented |
SF0341 # 05 Y:2007 | 05 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $99,580 | $37,915 | Not Implemented |
SF0341 # 06 Y:2007 | 06 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,960 | $9,373 | Implemented |
SF0341 # 07 Y:2007 | 07 | 2007 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $20,686 | $15,000 | Implemented |
SF0341 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,585 | $1,620 | Implemented |
SF0341 # 09 Y:2007 | 09 | 2007 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $51,342 | $60,000 | Implemented |
SF0341 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,113 | $1,512 | Not Implemented |
SF0341 # 11 Y:2007 | 11 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,983 | $19,920 | Implemented |
SF0341 # 12 Y:2007 | 12 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $904 | $2,887 | Not Implemented |