Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
594
matching recommendationsNAICS | 3314 | Nonferrous Metal (except Aluminum) Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0536 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,020 | $0 | n/a |
UC2308 # 12 Y:2023 | 12 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $85,414 | $609,968 | Not Implemented |
UC2308 # 11 Y:2023 | 11 | 2023 | MODIFY STARTUP/SHUTDOWN TIMES | $11,360 | $7,140 | Not Implemented |
UC2308 # 10 Y:2023 | 10 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $207,659 | $464,727 | Not Implemented |
UC2308 # 09 Y:2023 | 09 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $998 | $3,691 | Implemented |
UC2308 # 08 Y:2023 | 08 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,939 | $27,365 | Not Implemented |
UC2308 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,525 | $1,300 | Not Implemented |
UC2308 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,434 | $300 | Implemented |
UC2308 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,549 | $428 | Not Implemented |
UC2308 # 04 Y:2023 | 04 | 2023 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $55,687 | $171,637 | Not Implemented |
UC2308 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,353 | $987 | Implemented |
UC2308 # 02 Y:2023 | 02 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $41,561 | $0 | Implemented |
UC2308 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $204,687 | $50,000 | Implemented |
WV0639 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,281,087 | $1,151,450 | Not Implemented |
WV0639 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $76,363 | $381,250 | Not Implemented |
WV0639 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,872 | $1,250 | Implemented |
WV0639 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $17,944 | $36,920 | Not Implemented |
WV0639 # 05 Y:2023 | 05 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $11,555 | $2,233 | Implemented |
WV0639 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,297 | $100 | Implemented |
WV0639 # 13 Y:2023 | 13 | 2023 | INSULATE BARE EQUIPMENT | $268 | $211 | Implemented |
WV0639 # 12 Y:2023 | 12 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,627 | $7,083 | Implemented |
WV0639 # 11 Y:2023 | 11 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,250 | $908 | Implemented |
WV0639 # 10 Y:2023 | 10 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,843 | $10,000 | Not Implemented |
WV0639 # 09 Y:2023 | 09 | 2023 | INSULATE BARE EQUIPMENT | $5,246 | $3,107 | Implemented |
WV0639 # 08 Y:2023 | 08 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,827 | $16,000 | Not Implemented |