Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
85
matching recommendationsNAICS | 3314 | Nonferrous Metal (except Aluminum) Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0301 # 02 Y:2011 | 02 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,978 | $689 | Not Implemented |
SU0301 # 01 Y:2011 | 01 | 2011 | USE POWER DURING OFF-PEAK PERIODS | $4,632 | $0 | Not Implemented |
SU0266 # 07 Y:2008 | 07 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $114 | $65 | Not Implemented |
SU0266 # 01 Y:2008 | 01 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,391 | $0 | Not Implemented |
SU0266 # 02 Y:2008 | 02 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,817 | $0 | Not Implemented |
SU0266 # 09 Y:2008 | 09 | 2008 | INSTALL OCCUPANCY SENSORS | $100 | $626 | Not Implemented |
SU0266 # 08 Y:2008 | 08 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,220 | $40,650 | Not Implemented |
SU0266 # 03 Y:2008 | 03 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,166 | $0 | Implemented |
SU0266 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,096 | $424 | Implemented |
SU0266 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,953 | $339 | Implemented |
SU0266 # 04 Y:2008 | 04 | 2008 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $151,996 | $23,800 | Not Implemented |
SU0265 # 05 Y:2008 | 05 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $786 | $223 | Implemented |
SU0265 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,263 | $3,368 | Not Implemented |
SU0265 # 07 Y:2008 | 07 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $171 | $310 | Not Implemented |
SU0265 # 08 Y:2008 | 08 | 2008 | OPTIMIZE PLANT POWER FACTOR | $921 | $4,079 | Not Implemented |
SU0265 # 03 Y:2008 | 03 | 2008 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $214,622 | $23,800 | Not Implemented |
SU0265 # 02 Y:2008 | 02 | 2008 | USE SYNTHETIC LUBRICANT | $191 | $0 | Not Implemented |
SU0265 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $468 | $0 | Not Implemented |
SU0265 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,615 | $252 | Implemented |
SU0226 # 01 Y:2006 | 01 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $19,304 | $0 | n/a |
SU0226 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $785 | $1,422 | n/a |
SU0226 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,426 | $0 | n/a |
SU0226 # 10 Y:2006 | 10 | 2006 | OPTIMIZE PLANT POWER FACTOR | $5,381 | $33,320 | n/a |
SU0226 # 09 Y:2006 | 09 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $321 | $684 | n/a |
SU0226 # 08 Y:2006 | 08 | 2006 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $53,622 | $114,259 | n/a |