Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2011 |
Principal Product | Nickel Cobalt based superalloy materials |
NAICS | 331492 - Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) |
SIC | 3399 - Primary Metal Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 127,000 |
Annual Production | 75,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $523,581 | 5,108,647 | kWh | $0.10 |
Electricity Demand | $209,273 | 28,515 | kW-months/year | $7.34 |
Electricity Fees | $(-54,564) | - | $ | - |
Natural Gas | $69,137 | 5,423 | MMBtu | $12.75 |
TOTAL ENERGY COSTS | $748,277 | |||
RECOMMENDED SAVINGS* | $28,362 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,477 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Electricity Fees | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS |
Savings: $4,632 Cost: - |
- | - | - | - | - | - | $4,632 | - |
- - kWh |
- - kW-months/year |
- - $ |
$4,632 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,978 Cost: $689 |
$2,978 | 28,908 | - | - | - | - | - | - |
$2,978 28,908 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,477 Cost: $2,028 |
$2,477 | 24,046 | - | - | - | - | - | - |
$2,477 24,046 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5145 RECOVER AND REUSE SPENT ACID BATHS |
Savings: $1,049 Cost: $958 |
$(-62) | (-600) | $(-9) | (-1) | - | - | $1,120 | - |
$(-62) (-600) kWh |
$(-9) (-1) kW-months/year |
- - $ |
$1,120 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $377 Cost: $487 |
$180 | 1,752 | $18 | 2 | - | - | $179 | - |
$180 1,752 kWh |
$18 2 kW-months/year |
- - $ |
$179 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $496 Cost: $895 |
$496 | 4,817 | - | - | - | - | - | - |
$496 4,817 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $11,025 Cost: $26,043 |
$(-2,887) | (-28,032) | $(-279) | (-38) | - | - | $14,191 | - |
$(-2,887) (-28,032) kWh |
$(-279) (-38) kW-months/year |
- - $ |
$14,191 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $5,328 Cost: $18,204 |
- | - | - | - | $5,328 | - | - | - |
- - kWh |
- - kW-months/year |
$5,328 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,362 Cost: $49,304 |
$3,182 | 30,891 | $(-270) | (-37) | $5,328 | - | $20,122 | - | $3,182 30,891 kWh |
$(-270) (-37) kW-months/year |
$5,328 - $ |
$20,122 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,477 Cost: $2,028 |
$2,477 | 24,046 | - | - | - | - | - | - | $2,477 24,046 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Electricity Fees | One-time Revenue or Avoided Cost |