IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

594

matching recommendations
Reset
NAICS 3314 Nonferrous Metal (except Aluminum) Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0074 # 04 Y:2016 04 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,398 $951 Implemented
IP0074 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,366 $308 Implemented
IP0074 # 06 Y:2016 06 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $473 $101 Implemented
IP0074 # 07 Y:2016 07 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $20,689 $4,600 Not Implemented
IP0074 # 08 Y:2016 08 2016 APPLY FOR INVESTMENT INCENTIVES $6,707 $5,000 Implemented
IP0074 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,616 $56,725 Implemented
IP0074 # 10 Y:2016 10 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $147,202 $313,184 Not Implemented
CO0725 # 01 Y:2016 01 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,690 $100 n/a
CO0725 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,970 $1,390 n/a
CO0725 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $6,010 $620 n/a
CO0725 # 04 Y:2016 04 2016 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $5,930 $24,000 n/a
CO0725 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,040 $13,050 n/a
CO0725 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,050 $2,950 n/a
MI0293 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $6,347 $1,120 Not Implemented
MI0293 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,469 $6,560 Implemented
MI0293 # 03 Y:2016 03 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,663 $8,284 Implemented
MI0293 # 04 Y:2016 04 2016 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $4,417 $8,450 Not Implemented
MI0293 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,266 $3,600 Implemented
MI0293 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,795 $8,400 Implemented
MI0293 # 07 Y:2016 07 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,436 $760 Not Implemented
MI0293 # 08 Y:2016 08 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,349 $40 Implemented
MI0293 # 09 Y:2016 09 2016 USE OPTIMUM THICKNESS INSULATION $2,315 $320 Not Implemented
MI0293 # 10 Y:2016 10 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,965 $40 Implemented
MI0293 # 11 Y:2016 11 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,742 $4,691 Not Implemented
MI0293 # 12 Y:2016 12 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,627 $1,480 Not Implemented