Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
594
matching recommendationsNAICS | 3314 | Nonferrous Metal (except Aluminum) Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0074 # 04 Y:2016 | 04 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,398 | $951 | Implemented |
IP0074 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,366 | $308 | Implemented |
IP0074 # 06 Y:2016 | 06 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $473 | $101 | Implemented |
IP0074 # 07 Y:2016 | 07 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $20,689 | $4,600 | Not Implemented |
IP0074 # 08 Y:2016 | 08 | 2016 | APPLY FOR INVESTMENT INCENTIVES | $6,707 | $5,000 | Implemented |
IP0074 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,616 | $56,725 | Implemented |
IP0074 # 10 Y:2016 | 10 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $147,202 | $313,184 | Not Implemented |
CO0725 # 01 Y:2016 | 01 | 2016 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $8,690 | $100 | n/a |
CO0725 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,970 | $1,390 | n/a |
CO0725 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $6,010 | $620 | n/a |
CO0725 # 04 Y:2016 | 04 | 2016 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $5,930 | $24,000 | n/a |
CO0725 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,040 | $13,050 | n/a |
CO0725 # 06 Y:2016 | 06 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,050 | $2,950 | n/a |
MI0293 # 01 Y:2016 | 01 | 2016 | INSTALL OCCUPANCY SENSORS | $6,347 | $1,120 | Not Implemented |
MI0293 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,469 | $6,560 | Implemented |
MI0293 # 03 Y:2016 | 03 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,663 | $8,284 | Implemented |
MI0293 # 04 Y:2016 | 04 | 2016 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $4,417 | $8,450 | Not Implemented |
MI0293 # 05 Y:2016 | 05 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,266 | $3,600 | Implemented |
MI0293 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,795 | $8,400 | Implemented |
MI0293 # 07 Y:2016 | 07 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,436 | $760 | Not Implemented |
MI0293 # 08 Y:2016 | 08 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,349 | $40 | Implemented |
MI0293 # 09 Y:2016 | 09 | 2016 | USE OPTIMUM THICKNESS INSULATION | $2,315 | $320 | Not Implemented |
MI0293 # 10 Y:2016 | 10 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,965 | $40 | Implemented |
MI0293 # 11 Y:2016 | 11 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,742 | $4,691 | Not Implemented |
MI0293 # 12 Y:2016 | 12 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,627 | $1,480 | Not Implemented |