Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
594
matching recommendationsNAICS | 3314 | Nonferrous Metal (except Aluminum) Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0293 # 13 Y:2016 | 13 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,603 | $1,660 | Implemented |
MI0293 # 14 Y:2016 | 14 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $744 | $2,400 | Not Implemented |
MI0293 # 15 Y:2016 | 15 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $286 | $605 | Not Implemented |
MI0293 # 16 Y:2016 | 16 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $115 | $320 | Not Implemented |
LE0400 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,723 | $28 | Implemented |
LE0400 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,648 | $512 | Implemented |
LE0400 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,673 | $1,000 | Implemented |
LE0400 # 04 Y:2015 | 04 | 2015 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $8,953 | $1,920 | Not Implemented |
LE0400 # 05 Y:2015 | 05 | 2015 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $30,027 | $5,000 | Not Implemented |
LE0400 # 06 Y:2015 | 06 | 2015 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $27,922 | $10,500 | Not Implemented |
LE0400 # 07 Y:2015 | 07 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,457 | $3,025 | Implemented |
LE0400 # 08 Y:2015 | 08 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,074 | $35,000 | Not Implemented |
LE0400 # 09 Y:2015 | 09 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,334 | $16,500 | Implemented |
LE0400 # 10 Y:2015 | 10 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,729 | $48,067 | Implemented |
LE0400 # 11 Y:2015 | 11 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $42,371 | $95,000 | Not Implemented |
LE0400 # 12 Y:2015 | 12 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,188 | $5,469 | Implemented |
LE0400 # 13 Y:2015 | 13 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,886 | $69,160 | Implemented |
LE0400 # 14 Y:2015 | 14 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $5,902 | $24,000 | Implemented |
LE0400 # 15 Y:2015 | 15 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,678 | $6,940 | Implemented |
LE0400 # 16 Y:2015 | 16 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,312 | $35,000 | Implemented |
TT0159 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,644 | $3,000 | Implemented |
TT0159 # 02 Y:2015 | 02 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $19,647 | $20,000 | Not Implemented |
TT0159 # 03 Y:2015 | 03 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $17,175 | $38,170 | Not Implemented |
TT0159 # 04 Y:2015 | 04 | 2015 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,659 | $700 | Not Implemented |
TT0159 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,329 | $63 | Not Implemented |