Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsNAICS | 331410 | Nonferrous Metal (except Aluminum) Smelting and Refining |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0639 # 13 Y:2023 | 13 | 2023 | INSULATE BARE EQUIPMENT | $268 | $211 | Implemented |
WV0639 # 12 Y:2023 | 12 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,627 | $7,083 | Implemented |
WV0639 # 11 Y:2023 | 11 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,250 | $908 | Implemented |
WV0639 # 10 Y:2023 | 10 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,843 | $10,000 | Not Implemented |
WV0639 # 09 Y:2023 | 09 | 2023 | INSULATE BARE EQUIPMENT | $5,246 | $3,107 | Implemented |
WV0639 # 08 Y:2023 | 08 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,827 | $16,000 | Not Implemented |
WV0639 # 07 Y:2023 | 07 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $7,420 | $25,000 | Not Implemented |
WV0639 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,297 | $100 | Implemented |
WV0639 # 05 Y:2023 | 05 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $11,555 | $2,233 | Implemented |
WV0639 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $17,944 | $36,920 | Not Implemented |
WV0639 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,872 | $1,250 | Implemented |
WV0639 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $76,363 | $381,250 | Not Implemented |
WV0639 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,281,087 | $1,151,450 | Not Implemented |
WV0375 # 17 Y:2008 | 17 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,975 | $652 | Not Implemented |
WV0375 # 19 Y:2008 | 19 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,275 | $0 | Not Implemented |
WV0375 # 18 Y:2008 | 18 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,797 | $10,125 | Implemented |
WV0375 # 01 Y:2008 | 01 | 2008 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $1,181,139 | $1,147,130 | Not Implemented |
WV0375 # 16 Y:2008 | 16 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,374 | $52 | Implemented |
WV0375 # 15 Y:2008 | 15 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $7,595 | $4,650 | Not Implemented |
WV0375 # 14 Y:2008 | 14 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,983 | $772 | Implemented |
WV0375 # 13 Y:2008 | 13 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $29,817 | $2,000 | Implemented |
WV0375 # 12 Y:2008 | 12 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $32,477 | $1,338 | Implemented |
WV0375 # 11 Y:2008 | 11 | 2008 | USE OPTIMUM THICKNESS INSULATION | $33,427 | $6,567 | Implemented |
WV0375 # 10 Y:2008 | 10 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $34,143 | $15,525 | Not Implemented |
WV0375 # 09 Y:2008 | 09 | 2008 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $57,494 | $25,520 | Not Implemented |