IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 331410 Nonferrous Metal (except Aluminum) Smelting and Refining
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0349 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,603 $150 Not Implemented
SF0349 # 15 Y:2007 15 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,751 $37,915 Not Implemented
SF0349 # 14 Y:2007 14 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,454 $11,000 Not Implemented
SF0349 # 13 Y:2007 13 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $335 $980 Not Implemented
SF0349 # 12 Y:2007 12 2007 USE PHOTOCELL CONTROLS $3,302 $9,569 Implemented
SF0349 # 11 Y:2007 11 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,597 $52,080 Not Implemented
SF0349 # 10 Y:2007 10 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,554 $4,281 Implemented
SF0349 # 09 Y:2007 09 2007 COVER OPEN TANKS $12,984 $14,940 Not Implemented
SF0349 # 08 Y:2007 08 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,042 $2,339 Not Implemented
SF0349 # 07 Y:2007 07 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,644 $8,646 Not Implemented
SF0349 # 06 Y:2007 06 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $725 $757 Implemented
SF0349 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,490 $1,992 Implemented
SF0349 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,139 $10,019 Not Implemented
SF0349 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,755 $0 Implemented
SF0349 # 01 Y:2007 01 2007 REPAIR AND ELIMINATE STEAM LEAKS $6,853 $0 Implemented
SF0341 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,716 $0 Implemented
SF0341 # 13 Y:2007 13 2007 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $17,456 $0 Implemented
SF0341 # 12 Y:2007 12 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $904 $2,887 Not Implemented
SF0341 # 11 Y:2007 11 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,983 $19,920 Implemented
SF0341 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,113 $1,512 Not Implemented
SF0341 # 09 Y:2007 09 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $51,342 $60,000 Implemented
SF0341 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,585 $1,620 Implemented
SF0341 # 07 Y:2007 07 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $20,686 $15,000 Implemented
SF0341 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,960 $9,373 Implemented
SF0341 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $99,580 $37,915 Not Implemented