IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
NAICS 331410 Nonferrous Metal (except Aluminum) Smelting and Refining
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0435 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $966 $2,500 Implemented
UM0435 # 01 Y:2013 01 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,450 $4,500 Implemented
UM0435 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,500 $200 Not Implemented
UM0435 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,000 $3,000 Implemented
WV0436 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,039 $1,920 Not Implemented
WV0436 # 03 Y:2011 03 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $21,604 $29,900 Not Implemented
WV0436 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,227 $12,576 Implemented
WV0436 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,983 $8,375 Not Implemented
WV0436 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $32,243 $22,700 Not Implemented
WV0436 # 09 Y:2011 09 2011 INSTALL TIMERS AND/OR THERMOSTATS $4,976 $5,400 Not Implemented
WV0436 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $335 $154 Implemented
WV0436 # 10 Y:2011 10 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,400 $1,000 Implemented
WV0436 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,837 $45,545 Implemented
WV0436 # 07 Y:2011 07 2011 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $7,082 $25,000 Not Implemented
WV0436 # 01 Y:2011 01 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $62,911 $74,268 Not Implemented
OK0780 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $31,638 $89,399 Not Implemented
OK0780 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $312 $732 Not Implemented
OK0780 # 09 Y:2009 09 2009 INSTALL OCCUPANCY SENSORS $1,517 $274 Not Implemented
OK0780 # 10 Y:2009 10 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,725 $10,000 Implemented
OK0780 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $24,432 $100,710 Not Implemented
OK0780 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,642 $21,120 Not Implemented
OK0780 # 13 Y:2009 13 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,206 $2,398 Implemented
OK0780 # 14 Y:2009 14 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,341 $0 Implemented
OK0780 # 04 Y:2009 04 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $853,347 $1,183,200 Not Implemented
OK0780 # 02 Y:2009 02 2009 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $66,265 $0 Implemented