IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
NAICS 331410 Nonferrous Metal (except Aluminum) Smelting and Refining
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0827 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,909 $26,950 Implemented
MA0827 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,022 $11,050 Not Implemented
MA0827 # 04 Y:2021 04 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,685 $2,000 Implemented
MA0827 # 05 Y:2021 05 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,962 $10,800 Not Implemented
MA0827 # 06 Y:2021 06 2021 MINIMIZE WATER USAGE $1,374 $3,230 Not Implemented
MA0827 # 07 Y:2021 07 2021 INSULATE BARE EQUIPMENT $801 $1,550 Not Implemented
MA0827 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $32,062 $75,000 Not Implemented
UU0177 # 10 Y:2021 10 2021 INSTALL OCCUPANCY SENSORS $1,441 $1,625 Not Implemented
UU0177 # 09 Y:2021 09 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,497 $100 Implemented
UU0177 # 08 Y:2021 08 2021 REDUCE VENTILATION AIR $4,129 $4,000 Implemented
UU0177 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,105 $11,650 Implemented
UU0177 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,132 $22,614 Not Implemented
UU0177 # 05 Y:2021 05 2021 OPTIMIZE PLANT POWER FACTOR $10,455 $14,250 Implemented
UU0177 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,515 $5,046 Implemented
UU0177 # 03 Y:2021 03 2021 USE RADIANT HEATER FOR SPOT HEATING $32,792 $101,000 Not Implemented
UU0177 # 02 Y:2021 02 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $36,240 $6,760 Implemented
UU0177 # 01 Y:2021 01 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $57,706 $128,174 Not Implemented