Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsNAICS | 33149 | Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, Extruding, and Alloying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0356 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,126 | $3,215 | Implemented |
LE0356 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,905 | $5,175 | Implemented |
LE0356 # 12 Y:2013 | 12 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,638 | $1,086 | Implemented |
LE0356 # 11 Y:2013 | 11 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,608 | $25,060 | Not Implemented |
LE0356 # 10 Y:2013 | 10 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,399 | $3,700 | Implemented |
LE0356 # 09 Y:2013 | 09 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,341 | $0 | Implemented |
LE0356 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,139 | $1,500 | Not Implemented |
LE0356 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,343 | $1,000 | Not Implemented |
LE0356 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,451 | $520 | Not Implemented |
LE0356 # 05 Y:2013 | 05 | 2013 | ADJUST BURNERS FOR EFFICIENT OPERATION | $756 | $0 | Implemented |
LE0356 # 04 Y:2013 | 04 | 2013 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $146 | $338 | Not Implemented |
LE0356 # 03 Y:2013 | 03 | 2013 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,894 | $51,200 | Not Implemented |
MZ0107 # 12 Y:2013 | 12 | 2013 | USE PHOTOCELL CONTROLS | $265 | $320 | Implemented |
MZ0107 # 11 Y:2013 | 11 | 2013 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $845 | $1,115 | Implemented |
MZ0107 # 10 Y:2013 | 10 | 2013 | USE OPTIMUM THICKNESS INSULATION | $1,288 | $1,499 | Implemented |
MZ0107 # 09 Y:2013 | 09 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,541 | $1,810 | Implemented |
MZ0107 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,356 | $710 | Implemented |
MZ0107 # 07 Y:2013 | 07 | 2013 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $2,484 | $1,261 | Not Implemented |
MZ0107 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,600 | $1,745 | Implemented |
MZ0107 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $4,907 | $3,080 | Implemented |
MZ0107 # 04 Y:2013 | 04 | 2013 | USE OPTIMUM THICKNESS INSULATION | $6,130 | $1,825 | Implemented |
MZ0107 # 03 Y:2013 | 03 | 2013 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $12,972 | $3,240 | Not Implemented |
MZ0107 # 02 Y:2013 | 02 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $43,709 | $1,000 | Implemented |
MZ0107 # 01 Y:2013 | 01 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $76,156 | $80,528 | Not Implemented |