IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143

matching recommendations
Reset
NAICS 331492 Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0301 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $2,477 $2,028 Implemented
SU0301 # 04 Y:2011 04 2011 RECOVER AND REUSE SPENT ACID BATHS $1,049 $958 Not Implemented
SU0301 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $377 $487 Not Implemented
SU0301 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $496 $895 Not Implemented
SU0301 # 07 Y:2011 07 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,025 $26,043 Not Implemented
SU0301 # 08 Y:2011 08 2011 OPTIMIZE PLANT POWER FACTOR $5,328 $18,204 Not Implemented
LE0310 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,531 $10,000 Implemented
LE0310 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,363 $200 Implemented
LE0310 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,484 $1,420 Implemented
LE0310 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,986 $2,500 Implemented
LE0310 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,225 $20 Implemented
LE0310 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $875 $300 Not Implemented
LE0310 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,896 $4,636 Not Implemented
LE0310 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,402 $7,308 Not Implemented
LE0310 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,927 $30,380 Not Implemented
CO0621 # 01 Y:2009 01 2009 INSULATE BARE EQUIPMENT $310 $1,730 Not Implemented
CO0621 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,570 $3,690 Implemented
CO0621 # 03 Y:2009 03 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $1,780 $10,500 Not Implemented
CO0621 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $930 $4,360 Not Implemented
CO0621 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $600 $1,010 Not Implemented
CO0621 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $400 $510 Implemented
CO0621 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $360 $650 Not Implemented
LE0274 # 01 Y:2008 01 2008 INSTALL TIMERS AND/OR THERMOSTATS $18,751 $1,800 Not Implemented
LE0274 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,058 $10,000 Not Implemented
LE0274 # 03 Y:2008 03 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,438 $7,000 Not Implemented