Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,091
matching recommendationsNAICS | 3315 | Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0603 # 07 Y:2025 | 07 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $478 | $246 | n/a |
AS0603 # 01 Y:2025 | 01 | 2025 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $320,000 | $104,670 | n/a |
AS0603 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $172,434 | $1,040,663 | n/a |
AS0603 # 04 Y:2025 | 04 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $18,772 | $291 | n/a |
AS0603 # 06 Y:2025 | 06 | 2025 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,156 | $949 | n/a |
AS0603 # 05 Y:2025 | 05 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,172 | $545 | n/a |
AS0603 # 02 Y:2025 | 02 | 2025 | USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS | $279,654 | $313,240 | n/a |
IP0205 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,645 | $7,496 | n/a |
IP0205 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21,763 | $0 | n/a |
IP0205 # 06 Y:2024 | 06 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $46,331 | $50,406 | n/a |
IP0205 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $1,388 | $3,150 | n/a |
IP0205 # 04 Y:2024 | 04 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $27,000 | $2,636 | n/a |
IP0205 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $35,159 | $0 | n/a |
IP0205 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,693 | $523 | n/a |
IP0205 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,100 | $872 | n/a |
IP0205 # 08 Y:2024 | 08 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $30,273 | $56,876 | n/a |
WM0237 # 01 Y:2025 | 01 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,320 | $3,350 | n/a |
WM0237 # 02 Y:2025 | 02 | 2025 | REPLACE BOILER | $6,383 | $56,908 | n/a |
WM0237 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,168 | $1,487 | n/a |
WM0237 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $894 | $349 | n/a |
WM0237 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,999 | $0 | n/a |
WM0233 # 01 Y:2025 | 01 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $97,017 | $800,000 | n/a |
WM0233 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,278 | $0 | n/a |
WM0233 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,262 | $1,500 | n/a |
WM0233 # 03 Y:2025 | 03 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $2,094 | $18,160 | n/a |