IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,988

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0207 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,028 $12,825 n/a
WM0207 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,619 $4,084 n/a
WM0207 # 02 Y:2024 02 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $16,759 $2,500 n/a
TT0296 # 06 Y:2023 06 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $81,000 $60,000 n/a
TT0296 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,078 $4,500 n/a
TT0296 # 03 Y:2023 03 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $200,000 $10,000 n/a
TT0296 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,264 $1,920 n/a
TT0296 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $22,207 $1,640 n/a
TT0296 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $41,037 $32,500 n/a
TT0296 # 11 Y:2023 11 2023 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,853 $7,500 n/a
TT0296 # 10 Y:2023 10 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $203,680 $300,000 n/a
TT0296 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,069 $270 n/a
TT0296 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,690 $8,100 n/a
TT0296 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $66,640 $2,000 n/a
CW0127 # 06 Y:2023 06 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $9,906 $19,900 n/a
CW0127 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,576 $56,000 n/a
CW0127 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,943 $21,648 n/a
CW0127 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $16,199 $33,933 n/a
CW0127 # 05 Y:2023 05 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $10,872 $33,000 n/a
CW0127 # 03 Y:2023 03 2023 RECYCLE CASTING SAND $414,227 $38,394 n/a
UF0595 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $95,368 $289,896 Not Implemented
UF0595 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $39,683 $20,785 Implemented
UF0595 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,458 $356 Implemented
UF0595 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,931 $25,400 Implemented
UF0595 # 04 Y:2023 04 2023 USER BATTERY STORAGE FOR POWER QUALITY ISSUES $6,261 $20,000 Not Implemented