IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,045

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0004 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,488 $1,400 Not Implemented
UA0004 # 06 Y:2007 06 2007 SHUT OFF PILOTS IN STANDBY EQUIPMENT $2,169 $230 Implemented
UA0004 # 07 Y:2007 07 2007 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $5,479 $400 Not Implemented
UA0004 # 08 Y:2007 08 2007 UPGRADE OBSOLETE EQUIPMENT $47,141 $67,908 Not Implemented
UA0004 # 09 Y:2007 09 2007 USE OPTIMUM THICKNESS INSULATION $17,420 $1,926 Not Implemented
UA0004 # 10 Y:2007 10 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,180 $2,897 Not Implemented
UA0004 # 11 Y:2007 11 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,282 $0 Not Implemented
IC0128 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,654 $1,710 Implemented
IC0128 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $10,523 $6,000 Not Implemented
IC0128 # 03 Y:2007 03 2007 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $25,162 $21,540 Implemented
IC0128 # 04 Y:2007 04 2007 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $103,122 $9,600 Not Implemented
IC0128 # 05 Y:2007 05 2007 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $44,610 $0 Not Implemented
IC0128 # 06 Y:2007 06 2007 IMPROVE SPACE COMFORT CONDITIONING $11,886 $10,408 Not Implemented
IC0128 # 07 Y:2007 07 2007 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $21,900 $5,883 Implemented
IC0128 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,566 $11,407 Implemented
IC0128 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $249 $260 Implemented
IC0128 # 10 Y:2007 10 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,851 $30,665 Implemented
UD0761 # 01 Y:2007 01 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $56,539 $15,760 Implemented
UD0761 # 02 Y:2007 02 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $26,967 $130,000 Implemented
UD0761 # 03 Y:2007 03 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,895 $660 Implemented
UD0761 # 04 Y:2007 04 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $15,090 $93,600 Implemented
UD0761 # 05 Y:2007 05 2007 COVER OPEN TANKS $12,478 $1,243 Not Implemented
UD0761 # 06 Y:2007 06 2007 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $4,701 $4,500 Not Implemented
UD0761 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,079 $11,000 Implemented
UD0761 # 08 Y:2007 08 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,582 $2,000 Implemented