IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,045

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0549 # 09 Y:2004 09 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,021 $1,100 Implemented
MA0549 # 10 Y:2004 10 2004 INSULATE BARE EQUIPMENT $463 $451 Not Implemented
MA0549 # 11 Y:2004 11 2004 DISCONNECT BALLASTS $197 $60 Implemented
SU0183 # 01 Y:2004 01 2004 ADVERTISE PRODUCT OR SERVICE $83,900 $0 Implemented
SU0183 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,014 $0 Not Implemented
SU0183 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $331 $0 Implemented
SU0183 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,663 $502 Not Implemented
SU0183 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,191 $680 Implemented
SU0183 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $18,502 $12,517 Not Implemented
SU0183 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $483 $523 Implemented
SU0183 # 08 Y:2004 08 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $11,288 $16,817 Implemented
SU0183 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,121 $25,260 Not Implemented
UD0692 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $47,634 $0 Not Implemented
UD0692 # 02 Y:2004 02 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,960 $6,000 Not Implemented
UD0692 # 03 Y:2004 03 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,672 $344 Not Implemented
UD0692 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,575 $325 Implemented
UD0692 # 05 Y:2004 05 2004 COVER OPEN TANKS $888 $3,450 Implemented
UD0692 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $570 $0 Not Implemented
UD0692 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $400 Implemented
UD0692 # 08 Y:2004 08 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $155 $53 Not Implemented
IA0335 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,405 $25 Not Implemented
IA0335 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,625 $474 Implemented
IA0335 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $886 $866 Implemented
IA0335 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,387 $6,232 Implemented
IA0335 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,647 $3,807 Implemented