Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
125
matching recommendationsNAICS | 3315 | Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0019 # 09 Y:2024 | 09 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $760 | $1,897 | n/a |
SJ0019 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $246 | $305 | n/a |
SJ0019 # 05 Y:2024 | 05 | 2024 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $253 | $332 | n/a |
SJ0019 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $585 | $0 | n/a |
SJ0019 # 08 Y:2024 | 08 | 2024 | RECYCLE CASTING SAND | $75,618 | $775,000 | n/a |
SJ0019 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,572 | $10,571 | n/a |
SJ0019 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $641 | $72 | n/a |
SJ0019 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,178 | $54 | n/a |
SJ0019 # 07 Y:2024 | 07 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $747 | $6,433 | n/a |
SJ0018 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,691 | $4,253 | n/a |
SJ0018 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,414 | $69 | n/a |
SJ0018 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,283 | $4,037 | n/a |
SJ0018 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,365 | $3,762 | n/a |
SJ0018 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $22,753 | $159,594 | n/a |
SJ0018 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,985 | $11,774 | n/a |
SJ0018 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,066 | $11,290 | n/a |
SD0632 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $424 | $1,176 | Not Implemented |
SD0632 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,102 | $7,882 | Not Implemented |
SD0632 # 08 Y:2023 | 08 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $936 | $3,415 | Not Implemented |
SD0632 # 03 Y:2023 | 03 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $41,916 | $76,410 | Not Implemented |
SD0632 # 04 Y:2023 | 04 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $85,551 | $277,200 | Not Implemented |
SD0632 # 10 Y:2023 | 10 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $741 | $3,554 | Not Implemented |
SD0632 # 09 Y:2023 | 09 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $27,630 | $115,136 | Not Implemented |
SD0632 # 07 Y:2023 | 07 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $2,044 | $8,803 | Not Implemented |
SD0632 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $566 | $1,200 | Not Implemented |