Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 3315 | Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0799 # 06 Y:2019 | 06 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,202 | $5,200 | Not Implemented |
MA0799 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,784 | $4,000 | Implemented |
MA0799 # 04 Y:2019 | 04 | 2019 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,709 | $2,500 | Implemented |
MA0799 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,442 | $14,461 | Implemented |
MA0799 # 02 Y:2019 | 02 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,826 | $47,870 | Not Implemented |
MA0799 # 01 Y:2019 | 01 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $27,506 | $138,640 | Not Implemented |
MA0549 # 05 Y:2004 | 05 | 2004 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $5,232 | $11,500 | Not Implemented |
MA0549 # 11 Y:2004 | 11 | 2004 | DISCONNECT BALLASTS | $197 | $60 | Implemented |
MA0549 # 10 Y:2004 | 10 | 2004 | INSULATE BARE EQUIPMENT | $463 | $451 | Not Implemented |
MA0549 # 09 Y:2004 | 09 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,021 | $1,100 | Implemented |
MA0549 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $1,041 | $896 | Implemented |
MA0549 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,794 | $315 | Implemented |
MA0549 # 06 Y:2004 | 06 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,412 | $0 | Implemented |
MA0549 # 04 Y:2004 | 04 | 2004 | IMPROVE COMBUSTION CONTROL CAPABILITY | $8,653 | $16,100 | Implemented |
MA0549 # 03 Y:2004 | 03 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $10,668 | $2,066 | Not Implemented |
MA0549 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,739 | $8,525 | Not Implemented |
MA0549 # 01 Y:2004 | 01 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $32,668 | $15,495 | Implemented |
MA0538 # 01 Y:2003 | 01 | 2003 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $141,119 | $1,825,320 | Not Implemented |
MA0538 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,238 | $85 | Implemented |
MA0538 # 07 Y:2003 | 07 | 2003 | OPTIMIZE PLANT POWER FACTOR | $10,424 | $31,667 | Not Implemented |
MA0538 # 06 Y:2003 | 06 | 2003 | USE RADIANT HEATER FOR SPOT HEATING | $10,594 | $44,750 | Not Implemented |
MA0538 # 05 Y:2003 | 05 | 2003 | COVER OPEN TANKS | $12,160 | $39,000 | Not Implemented |
MA0538 # 04 Y:2003 | 04 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,650 | $60,800 | Implemented |
MA0538 # 03 Y:2003 | 03 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $31,418 | $1,200 | Implemented |
MA0538 # 02 Y:2003 | 02 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $33,322 | $76,300 | Not Implemented |