IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0799 # 06 Y:2019 06 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,202 $5,200 Not Implemented
MA0799 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,784 $4,000 Implemented
MA0799 # 04 Y:2019 04 2019 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,709 $2,500 Implemented
MA0799 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,442 $14,461 Implemented
MA0799 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,826 $47,870 Not Implemented
MA0799 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,506 $138,640 Not Implemented
MA0549 # 05 Y:2004 05 2004 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $5,232 $11,500 Not Implemented
MA0549 # 11 Y:2004 11 2004 DISCONNECT BALLASTS $197 $60 Implemented
MA0549 # 10 Y:2004 10 2004 INSULATE BARE EQUIPMENT $463 $451 Not Implemented
MA0549 # 09 Y:2004 09 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,021 $1,100 Implemented
MA0549 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $1,041 $896 Implemented
MA0549 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,794 $315 Implemented
MA0549 # 06 Y:2004 06 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,412 $0 Implemented
MA0549 # 04 Y:2004 04 2004 IMPROVE COMBUSTION CONTROL CAPABILITY $8,653 $16,100 Implemented
MA0549 # 03 Y:2004 03 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,668 $2,066 Not Implemented
MA0549 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,739 $8,525 Not Implemented
MA0549 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $32,668 $15,495 Implemented
MA0538 # 01 Y:2003 01 2003 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $141,119 $1,825,320 Not Implemented
MA0538 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,238 $85 Implemented
MA0538 # 07 Y:2003 07 2003 OPTIMIZE PLANT POWER FACTOR $10,424 $31,667 Not Implemented
MA0538 # 06 Y:2003 06 2003 USE RADIANT HEATER FOR SPOT HEATING $10,594 $44,750 Not Implemented
MA0538 # 05 Y:2003 05 2003 COVER OPEN TANKS $12,160 $39,000 Not Implemented
MA0538 # 04 Y:2003 04 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,650 $60,800 Implemented
MA0538 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $31,418 $1,200 Implemented
MA0538 # 02 Y:2003 02 2003 IMPROVE COMBUSTION CONTROL CAPABILITY $33,322 $76,300 Not Implemented