IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0216 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $28,144 $4,000 Not Implemented
UU0216 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $33,351 $454,189 Not Implemented
UU0216 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $40,810 $55,030 Not Implemented
UU0216 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,031 $2,025 Not Implemented
UU0216 # 05 Y:2023 05 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,644 $500 Not Implemented
UU0216 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,370 $31,280 Not Implemented
UU0173 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $5,743 $3,188 Implemented
UU0173 # 08 Y:2021 08 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $661 $600 Not Implemented
UU0173 # 07 Y:2021 07 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $683 $2,361 Not Implemented
UU0173 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,018 $474 Implemented
UU0173 # 05 Y:2021 05 2021 ADJUST BURNERS FOR EFFICIENT OPERATION $1,292 $1,300 Not Implemented
UU0173 # 04 Y:2021 04 2021 INSULATE BARE EQUIPMENT $1,355 $594 Not Implemented
UU0173 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,755 $8,095 Implemented
UU0173 # 01 Y:2021 01 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,037 $2,000 Not Implemented
BS0078 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,130 $11,073 Not Implemented
BS0078 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $174 $187 Not Implemented
BS0078 # 02 Y:2016 02 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,270 $8,259 Not Implemented
BS0078 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $415 $162 Not Implemented
BS0078 # 08 Y:2016 08 2016 UPGRADE CONTROLS ON COMPRESSORS $5,829 $3,661 Not Implemented
BS0078 # 05 Y:2016 05 2016 DEVELOP STANDARD OPERATING PROCEDURES $22,270 $4,336 Not Implemented
BS0078 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,178 $21,982 Not Implemented
BS0078 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,671 $827 Not Implemented
BS0078 # 09 Y:2016 09 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $262 $89 Not Implemented
AM0653 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,015 $2,000 Implemented
AM0653 # 05 Y:2014 05 2014 USE RADIANT HEATER FOR SPOT HEATING $9,860 $7,200 Not Implemented