Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
429
matching recommendationsNAICS | 3315 | Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0085 # 10 Y:2004 | 10 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $54,080 | $3,320 | Implemented |
LM0085 # 09 Y:2004 | 09 | 2004 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $3,360 | $1,850 | Implemented |
LM0085 # 03 Y:2004 | 03 | 2004 | CLEAN FOULING FROM WATER LINES REGULARLY | $2,852 | $180 | Implemented |
LM0085 # 05 Y:2004 | 05 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $5,902 | $600 | Implemented |
LM0085 # 04 Y:2004 | 04 | 2004 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,335 | $741 | Not Implemented |
LM0085 # 06 Y:2004 | 06 | 2004 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $26,300 | $4,450 | Implemented |
LM0085 # 07 Y:2004 | 07 | 2004 | $9,060 | $1,500 | Implemented | |
LM0085 # 08 Y:2004 | 08 | 2004 | DEVELOP STANDARD OPERATING PROCEDURES | $18,000 | $2,450 | Implemented |
LM0085 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,324 | $205 | Implemented |
LM0085 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $167 | $0 | Implemented |
LE0200 # 01 Y:2004 | 01 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,210 | $3,000 | Implemented |
LE0200 # 02 Y:2004 | 02 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $9,386 | $360 | Not Implemented |
LE0200 # 09 Y:2004 | 09 | 2004 | IMPROVE COMBUSTION CONTROL CAPABILITY | $857 | $200 | Implemented |
LE0200 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,266 | $750 | Implemented |
LE0200 # 07 Y:2004 | 07 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,132 | $400 | Implemented |
LE0200 # 08 Y:2004 | 08 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $904 | $500 | Implemented |
LE0200 # 03 Y:2004 | 03 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,305 | $800 | Implemented |
LE0200 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,878 | $4,000 | Implemented |
LE0200 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,198 | $0 | Implemented |
LE0200 # 11 Y:2004 | 11 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $657 | $380 | Implemented |
LE0200 # 10 Y:2004 | 10 | 2004 | USE OPTIMUM THICKNESS INSULATION | $768 | $300 | Implemented |
NC0296 # 02 Y:2004 | 02 | 2004 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $22,518 | $10,000 | Not Implemented |
NC0296 # 01 Y:2004 | 01 | 2004 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $39,660 | $7,500 | Implemented |
NC0296 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,562 | $2,000 | Implemented |
NC0296 # 04 Y:2004 | 04 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,604 | $7,125 | Not Implemented |